{"id":473014,"date":"2022-03-04T11:44:38","date_gmt":"2022-03-04T06:14:38","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=473014"},"modified":"2022-03-04T12:55:55","modified_gmt":"2022-03-04T07:25:55","slug":"usbrl-tunnel-t-77d-breakthrough-on-banihal-arpinchala-section-achieved","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/usbrl-tunnel-t-77d-breakthrough-on-banihal-arpinchala-section-achieved\/","title":{"rendered":"USBRL: Tunnel T-77D breakthrough on Banihal-Arpinchala section achieved"},"content":{"rendered":"<p>Banihal: A major milestone was achieved on the Udhampur to Baramulla rail project when the break-through of the Tunnel T-77D was executed on Thursday.<\/p>\n<p>The boring work of the tunnel was started from both directions till a point of meeting, said an official. \u201cThe opening of the meeting point to complete the boring of the tunnel is called break-through. <\/p>\n<p>As a result of meticulous planning and precise execution of tunneling work the line and level of the tunnel is perfectly matched in both portions after the break-through.<\/p>\n<p>With this, the boring work of the 1.911 Km long tunnel is complete. Tunnel T-77D of total length 1911m falls on the alignment connecting Banihal-Arpinchala section of USBRL Project of Northern Railway,\u201d said an official.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Banihal: A major milestone was achieved on the Udhampur to Baramulla rail project when the break-through of the Tunnel T-77D was executed on Thursday. The boring work of the tunnel was started from both directions till a point of meeting, said an official. \u201cThe opening of the meeting point to complete the boring of the tunnel is called break-through. As a result of meticulous planning and precise execution of tunneling work the line and level of the tunnel is perfectly matched in both portions after the break-through. With this, the boring work of the 1.911 Km long tunnel is complete. [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[147,130,181],"tags":[],"class_list":["post-473014","post","type-post","status-publish","format-standard","hentry","category-greater-kashmir","category-newspapers","category-roads-greater-kashmir"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/473014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=473014"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/473014\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=473014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=473014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=473014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}