{"id":472921,"date":"2022-03-04T10:06:32","date_gmt":"2022-03-04T04:36:32","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=472921"},"modified":"2022-03-04T11:15:57","modified_gmt":"2022-03-04T05:45:57","slug":"pune-infra-watch-maharail-begins-process-to-build-20-railway-stations-for-pune-nashik-semi-highspeed-rail-line","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/pune-infra-watch-maharail-begins-process-to-build-20-railway-stations-for-pune-nashik-semi-highspeed-rail-line\/","title":{"rendered":"Pune Infra Watch: MahaRail begins process to build 20 railway stations for Pune-Nashik semi-highspeed rail line"},"content":{"rendered":"<p>A year after the Maharashtra government announced the much-awaited Pune-Nashik semi-highspeed rail line that is expected to bring down the travel time between the two cities to less than two hours, the Maharashtra Rail Infrastructure Development Corporation Ltd (MRIDC) has begun the process for the construction of 20 railway stations on the 235.15-km broad-gauge rail route.<\/p>\n<p>\u201cWe have started the empanelment of civil contractors for the construction of railway station buildings along with that of residential accommodation, platforms, foot overbridges, station circulating areas and other utility structures, including architectural finishing, plumbing and high voltage electrical works, heating, ventilation and air conditioning in connection with the new high-speed electrified double rail line between Pune and Nashikl,\u201d said an MRIDC official.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A year after the Maharashtra government announced the much-awaited Pune-Nashik semi-highspeed rail line that is expected to bring down the travel time between the two cities to less than two hours, the Maharashtra Rail Infrastructure Development Corporation Ltd (MRIDC) has begun the process for the construction of 20 railway stations on the 235.15-km broad-gauge rail route. \u201cWe have started the empanelment of civil contractors for the construction of railway station buildings along with that of residential accommodation, platforms, foot overbridges, station circulating areas and other utility structures, including architectural finishing, plumbing and high voltage electrical works, heating, ventilation and air [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-472921","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/472921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=472921"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/472921\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=472921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=472921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=472921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}