{"id":466857,"date":"2022-02-08T09:25:27","date_gmt":"2022-02-08T03:55:27","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=466857"},"modified":"2022-02-08T10:00:38","modified_gmt":"2022-02-08T04:30:38","slug":"better-food-courts-vip-lounges-expansion-work-at-delhi-airports-terminal-1-arrival-hall-complete","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/better-food-courts-vip-lounges-expansion-work-at-delhi-airports-terminal-1-arrival-hall-complete\/","title":{"rendered":"Better food courts, VIP lounges: Expansion work at Delhi Airport\u2019s Terminal 1 arrival hall complete"},"content":{"rendered":"<p>The Delhi International Airport Limited (DIAL) Monday said they have completed the expansion work at the Delhi Airport\u2019s T1 arrival terminal. Domestic passengers at the airport will soon be able to experience the 800-square metre arrival hall with VIP lounges, galleries, better food courts and parking space.<\/p>\n<p>Under the Phase 3A expansion project, the terminal has been built to cater to 100-140 million passengers per year. Currently, the terminal capacity is 60-100 million. <\/p>\n<p>The new terminal has been built as a \u201cgreen building\u201d\u2014equipped with carbon-saving, green and cost-saving measures. Glass panels and green spaces will be incorporated to make the terminal eco-friendly. \u201cDIAL has used daylight concept in the terminal building, which will reduce electricity consumption, as there will be ample natural light during the day.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Delhi International Airport Limited (DIAL) Monday said they have completed the expansion work at the Delhi Airport\u2019s T1 arrival terminal. Domestic passengers at the airport will soon be able to experience the 800-square metre arrival hall with VIP lounges, galleries, better food courts and parking space. Under the Phase 3A expansion project, the terminal has been built to cater to 100-140 million passengers per year. Currently, the terminal capacity is 60-100 million. The new terminal has been built as a \u201cgreen building\u201d\u2014equipped with carbon-saving, green and cost-saving measures. Glass panels and green spaces will be incorporated to make the [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-466857","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/466857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=466857"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/466857\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=466857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=466857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=466857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}