{"id":466306,"date":"2022-02-04T15:53:12","date_gmt":"2022-02-04T10:23:12","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=466306"},"modified":"2022-02-04T15:53:12","modified_gmt":"2022-02-04T10:23:12","slug":"powergrid-corporation-approves-investments-worth-rs-677-crore","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/powergrid-corporation-approves-investments-worth-rs-677-crore\/","title":{"rendered":"Powergrid Corporation approves investments worth Rs 677 crore"},"content":{"rendered":"<p>Power Grid Corporation (PGCIL) on Thursday said its board has approved investments worth Rs 677.59 crore for transmission projects.<\/p>\n<p>The &#8216;Committee of Directors on Investment on Projects&#8217; at its meeting held on February 2 (Wednesday) approved investments worth Rs 677.59 crore, it said in a BSE filing.<\/p>\n<p>The projects include &#8220;Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs-LTA System&#8221; at an estimated cost of Rs 318.12 crore, scheduled to be commissioned by April, 2025 (matching with Pakaldul hydroelectric power (HEP) generation).<\/p>\n<p>The panel also approved &#8220;Transmission System Strengthening Scheme for evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II Part G1&#8243;&#8221; at an estimated cost of Rs 359.47 crore.<\/p>\n<p>This is scheduled to be commissioned by September 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Grid Corporation (PGCIL) on Thursday said its board has approved investments worth Rs 677.59 crore for transmission projects. The &#8216;Committee of Directors on Investment on Projects&#8217; at its meeting held on February 2 (Wednesday) approved investments worth Rs 677.59 crore, it said in a BSE filing. The projects include &#8220;Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs-LTA System&#8221; at an estimated cost of Rs 318.12 crore, scheduled to be commissioned by April, 2025 (matching with Pakaldul hydroelectric power (HEP) generation). The panel also approved &#8220;Transmission System Strengthening Scheme for evacuation of Power from Solar [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-466306","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/466306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=466306"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/466306\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=466306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=466306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=466306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}