{"id":461279,"date":"2022-01-11T10:14:22","date_gmt":"2022-01-11T04:44:22","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=461279"},"modified":"2022-01-11T10:38:07","modified_gmt":"2022-01-11T05:08:07","slug":"lt-construction-bags-significant-order-from-national-high-speed-rail-corporation-2","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-construction-bags-significant-order-from-national-high-speed-rail-corporation-2\/","title":{"rendered":"L&amp;T Construction bags significant order from National High Speed Rail Corporation"},"content":{"rendered":"<p>Larsen &amp; Toubro (L&amp;T) on Monday said its construction arm has bagged a significant order from National High Speed Rail Corporation Ltd (NHSRCL).<\/p>\n<p>The major scope of work for the project comprises design and construction of civil and building works for a double-line high speed railway of a length of 8.198 km, L&amp;T said in a statement.<\/p>\n<p>&#8220;The construction arm of Larsen &amp; Toubro has secured an order from the esteemed National High Speed Rail Corporation Limited (NHSRCL), to design and construct Package No. \u2013 MAHSR-C-5 of the Mumbai-Ahmedabad High Speed Rail Project, the first high speed rail corridor being implemented in the country,&#8221; the statement said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Larsen &amp; Toubro (L&amp;T) on Monday said its construction arm has bagged a significant order from National High Speed Rail Corporation Ltd (NHSRCL). The major scope of work for the project comprises design and construction of civil and building works for a double-line high speed railway of a length of 8.198 km, L&amp;T said in a statement. &#8220;The construction arm of Larsen &amp; Toubro has secured an order from the esteemed National High Speed Rail Corporation Limited (NHSRCL), to design and construct Package No. \u2013 MAHSR-C-5 of the Mumbai-Ahmedabad High Speed Rail Project, the first high speed rail corridor being [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,258,136],"tags":[],"class_list":["post-461279","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/461279","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=461279"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/461279\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=461279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=461279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=461279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}