{"id":460791,"date":"2022-01-07T11:16:42","date_gmt":"2022-01-07T05:46:42","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=460791"},"modified":"2022-01-07T11:16:42","modified_gmt":"2022-01-07T05:46:42","slug":"cabinet-approves-rs-12031-crore-green-power-transmission-scheme","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/cabinet-approves-rs-12031-crore-green-power-transmission-scheme\/","title":{"rendered":"Cabinet approves Rs 12,031-crore green power transmission scheme"},"content":{"rendered":"<p>The cabinet committee on economic affairs (CCEA) on Thursday approved the second phase of the green energy corridor scheme. About 10,750 circuit kilometres (ckm) of transmission lines and around 27,500 mega volt-amperes (MVA) of sub-station capacity will be installed to facilitate electricity evacuation of around 20 giga-watt (GW) of renewable energy projects in Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh in this phase.<\/p>\n<p>The estimated cost of the scheme is Rs 12,031 crore, and 33% of the project cost \u2014 around Rs 3,970.3 crore \u2014 will be met as central financial assistance.<\/p>\n<p>The transmission systems will be created between FY22 and FY26, and the central financial assistance is seen to lower the transmission charges, which will translate into lower power costs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The cabinet committee on economic affairs (CCEA) on Thursday approved the second phase of the green energy corridor scheme. About 10,750 circuit kilometres (ckm) of transmission lines and around 27,500 mega volt-amperes (MVA) of sub-station capacity will be installed to facilitate electricity evacuation of around 20 giga-watt (GW) of renewable energy projects in Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh in this phase. The estimated cost of the scheme is Rs 12,031 crore, and 33% of the project cost \u2014 around Rs 3,970.3 crore \u2014 will be met as central financial assistance. The transmission systems will [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,240,138],"tags":[],"class_list":["post-460791","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/460791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=460791"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/460791\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=460791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=460791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=460791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}