{"id":453292,"date":"2021-12-01T17:03:09","date_gmt":"2021-12-01T11:33:09","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=453292"},"modified":"2021-12-01T17:03:09","modified_gmt":"2021-12-01T11:33:09","slug":"solar-projects-of-107-gw-either-installed-or-under-implementation-says-minister-2","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/solar-projects-of-107-gw-either-installed-or-under-implementation-says-minister-2\/","title":{"rendered":"Solar projects of 107 GW either installed or under implementation, says minister"},"content":{"rendered":"<p>Solar energy generation projects totalling 107.46 GW are either installed or under various stages of implementation or tendering, Parliament was informed on Tuesday. India had set a target of having 100 GW of solar energy by 2022.<\/p>\n<p>&#8220;&#8230; a total of 107.46 GW solar energy capacity has either been installed or under various stages of implementation or tendering,&#8221; Power and New &amp; Renewable Energy R K Singh said in a written reply to the Rajya Sabha.<\/p>\n<p>The minister informed the House that a total of 46.25 GW of grid connected solar energy capacity has been installed in the country as of October 31, 2021. Further, a total of 36.65 GW capacity is under various stages of implementation and 24.56 GW capacity has been tendered.<\/p>\n<p>He also told the House that 7,555.16 MW of renewable energy capacity has been added during the current fiscal till October 31, 2021.<\/p>\n<p>India has added renewable energy capacity of 7,866.13 MW in 2020-21 and 9,061.26 MW in 2019-20.<\/p>\n<p>In a separate reply to the House, the minister stated, &#8220;Renewable energy projects (including large hydro) of capacity 63.64 GW are under various stages of implementation in the country.&#8221;<\/p>\n<p>The government has set a target of achieving 175 GW of renewable energy capacity (excluding large hydro) by December 2022.<\/p>\n<p>A total of 150 GW of renewable energy capacity (including large hydro) has been cumulatively installed in the country till date, the minister stated.<\/p>\n<p>In another reply, the minister stated, &#8220;Projects of 63.64 GW capacity are under various stages of implementation and 32.06 GW capacity are under various stages of bidding. Therefore, a total of 245.70 GW capacity has either been installed or under various stages of implementation \/bidding.&#8221;<\/p>\n<p>In another reply, the minister told the House that India has recorded 192,059.71 million units (MU) of electricity from renewable energy sources till September during the current fiscal.<\/p>\n<p>Power generation from the RE sources stood at 3,06,312.53 (MU) in 2020-21 and 2,99,900.62 MU in 2019-20.<\/p>\n<p>As per Central Electricity Authority&#8217;s National Electricity Plan, contribution of renewable energy sources is estimated to be around 20 per cent of the total electricity demand of the country in the year 2021-22 and 24 per cent by 2026-27, Singh added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar energy generation projects totalling 107.46 GW are either installed or under various stages of implementation or tendering, Parliament was informed on Tuesday. India had set a target of having 100 GW of solar energy by 2022. &#8220;&#8230; a total of 107.46 GW solar energy capacity has either been installed or under various stages of implementation or tendering,&#8221; Power and New &amp; Renewable Energy R K Singh said in a written reply to the Rajya Sabha. The minister informed the House that a total of 46.25 GW of grid connected solar energy capacity has been installed in the country as [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-453292","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/453292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=453292"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/453292\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=453292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=453292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=453292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}