{"id":453007,"date":"2021-12-01T08:38:07","date_gmt":"2021-12-01T03:08:07","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=453007"},"modified":"2021-12-01T09:50:58","modified_gmt":"2021-12-01T04:20:58","slug":"solar-projects-of-107-gw-either-installed-or-under-implementation-minister","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/solar-projects-of-107-gw-either-installed-or-under-implementation-minister\/","title":{"rendered":"Solar projects of 107 GW either installed or under implementation: Minister"},"content":{"rendered":"<p>Solar energy generation projects totalling 107.46 GW are either installed or under various stages of implementation or tendering, Parliament was informed on Tuesday.<\/p>\n<p>India had set a target of having 100 GW of solar energy by 2022.<\/p>\n<p>&#8220;&#8230; a total of 107.46 GW solar energy capacity has either been installed or under various stages of implementation or tendering,&#8221; Power and New &amp; Renewable Energy R K Singh said in a written reply to the Rajya Sabha.<\/p>\n<p>The minister informed the House that a total of 46.25 GW of grid connected solar energy capacity has been installed in the country as of October 31, 2021. Further, a total of 36.65 GW capacity is under various stages of implementation and 24.56 GW capacity has been tendered.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar energy generation projects totalling 107.46 GW are either installed or under various stages of implementation or tendering, Parliament was informed on Tuesday. India had set a target of having 100 GW of solar energy by 2022. &#8220;&#8230; a total of 107.46 GW solar energy capacity has either been installed or under various stages of implementation or tendering,&#8221; Power and New &amp; Renewable Energy R K Singh said in a written reply to the Rajya Sabha. The minister informed the House that a total of 46.25 GW of grid connected solar energy capacity has been installed in the country as [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-453007","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/453007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=453007"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/453007\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=453007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=453007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=453007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}