{"id":450082,"date":"2021-11-16T10:27:20","date_gmt":"2021-11-16T04:57:20","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=450082"},"modified":"2021-11-16T13:11:08","modified_gmt":"2021-11-16T07:41:08","slug":"sjvn-signs-pact-with-solarworld-to-develop-75-mw-solar-power-project-in-up","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/sjvn-signs-pact-with-solarworld-to-develop-75-mw-solar-power-project-in-up\/","title":{"rendered":"SJVN signs pact with Solarworld to develop 75-MW solar power project in UP"},"content":{"rendered":"<p>State-owned SJVN NSE 0.52 % has inked a pact with Noida-based Solarworld Energy Solutions Pvt Ltd to develop a 75-megawatt (MW) solar power project at the Parasan Solar Park in Uttar Pradesh for Rs 313.59 crore.<\/p>\n<p>&#8220;SJVN entered into contract agreement for the development of 75 MW (AC) solar power project at Parasan Solar Park, Uttar Pradesh, on an engineering-procurement-construction (EPC) basis with subsequent O&amp;M (operation and maintenance) for three years with Solarworld Energy Solutions Private Ltd, Noida,&#8221; SJVN said in a statement.<\/p>\n<p>The contract was signed in the presence of SJVN Chairman and Managing Director Nand Lal Sharma.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned SJVN NSE 0.52 % has inked a pact with Noida-based Solarworld Energy Solutions Pvt Ltd to develop a 75-megawatt (MW) solar power project at the Parasan Solar Park in Uttar Pradesh for Rs 313.59 crore. &#8220;SJVN entered into contract agreement for the development of 75 MW (AC) solar power project at Parasan Solar Park, Uttar Pradesh, on an engineering-procurement-construction (EPC) basis with subsequent O&amp;M (operation and maintenance) for three years with Solarworld Energy Solutions Private Ltd, Noida,&#8221; SJVN said in a statement. The contract was signed in the presence of SJVN Chairman and Managing Director Nand Lal Sharma.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-450082","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/450082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=450082"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/450082\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=450082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=450082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=450082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}