{"id":444131,"date":"2021-10-21T15:26:15","date_gmt":"2021-10-21T09:56:15","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=444131"},"modified":"2021-10-21T15:26:15","modified_gmt":"2021-10-21T09:56:15","slug":"bhel-completes-renovation-of-baira-siul-hydro-project-commissions-third-unit","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-completes-renovation-of-baira-siul-hydro-project-commissions-third-unit\/","title":{"rendered":"BHEL completes renovation of Baira Siul hydro project, commissions third unit"},"content":{"rendered":"<p>State-run engineering firm BHEL on Thursday said it has completed the renovation and modernization of the 3\u00d760 MW Baira Siul Hydro Power Station located at Chamba, in Himachal Pradesh. Bharat Heavy Electricals Limited (BHEL) has successfully completed R&amp;M (Renovation &amp; Modernization) and commissioned the third and final unit of the 3\u00d760 MW Baira Siul Hydro Power Station located in Chamba district of Himachal Pradesh, a company statement said.<\/p>\n<p>The first and second units of the station have already been renovated and commissioned in December, 2019 and October, 2020 respectively. Set up in 1981, Baira Siul is the first hydro station of NHPC Limited and also the first to be taken up for comprehensive R&amp;M. The R&amp;M of the project will result in restoration of output capacity and improvement in efficiency, besides leading to better plant availability and life extension of equipment.<\/p>\n<p>Significantly, the capacity of each unit has been maintained at the rated output of 60 MW, even at the reduced head of 238.1 metres, as compared to the originally designed rated head of 260 metres. Notably, BHEL is also the Original Equipment Manufacturer (OEM) of the hydro units which have been successfully operating for over 35 years, before being taken up for comprehensive R&amp;M.<\/p>\n<p>BHEL\u2019s scope in the project comprised design, manufacture, supply, replacement and commissioning of critical parts of turbines and auxiliaries, governors, generators and control and monitoring. The equipment has been supplied from BHEL\u2019s manufacturing units at Bhopal, Bengaluru and Jhansi, while the on-site installation activities were carried out by the company\u2019s Power Sector \u2013 Northern Region division, Noida.<\/p>\n<p>BHEL\u2019s hydro plants are successfully performing in India and across the world, including countries such as Afghanistan, Azerbaijan, Bhutan, Malaysia, Taiwan, Tajikistan, Rwanda, Thailand, New Zealand, Nepal and Vietnam. Within India, BHEL sets account for 46 per cent of the country\u2019s total installed hydro power capacity.<\/p>\n<p>Currently, BHEL is carrying out comprehensive R&amp;M of 14 hydro sets across the country, aggregating to 639 MW.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-run engineering firm BHEL on Thursday said it has completed the renovation and modernization of the 3\u00d760 MW Baira Siul Hydro Power Station located at Chamba, in Himachal Pradesh. Bharat Heavy Electricals Limited (BHEL) has successfully completed R&amp;M (Renovation &amp; Modernization) and commissioned the third and final unit of the 3\u00d760 MW Baira Siul Hydro Power Station located in Chamba district of Himachal Pradesh, a company statement said. The first and second units of the station have already been renovated and commissioned in December, 2019 and October, 2020 respectively. Set up in 1981, Baira Siul is the first hydro station [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-444131","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/444131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=444131"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/444131\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=444131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=444131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=444131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}