{"id":436704,"date":"2021-09-18T08:59:49","date_gmt":"2021-09-18T03:29:49","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=436704"},"modified":"2021-09-18T09:56:38","modified_gmt":"2021-09-18T04:26:38","slug":"coal-india-arm-eastern-coalfields-installs-250-kw-rooftop-solar-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/coal-india-arm-eastern-coalfields-installs-250-kw-rooftop-solar-project\/","title":{"rendered":"Coal India arm Eastern Coalfields installs 250 kW rooftop solar project"},"content":{"rendered":"<p>Eastern Coalfields Ltd (ECL), a subsidiary of Coal India, has commissioned a 250-kilowatt (kW) rooftop solar power project, ramping up its total installed solar rooftop capacity to 692 kW, according to a statement.<\/p>\n<p>The project was commissioned on Wednesday, Coal India Ltd (CIL) said in a statement.<\/p>\n<p>&#8220;ECL, the West Bengal-located coal-producing subsidiary of Coal India Ltd, commissioned a 250-kW rooftop solar power project on Wednesday ramping up its total installed solar roof top capacity to 692 kW,&#8221; the statement said.<\/p>\n<p>The implemented through the Solar Energy Corporation of India (SECI), the newly installed 250 kW plant set up at ECL&#8217;s headquarters in Sanctoria for captive consumption, has an average generation of 3.65 lakh units per annum.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eastern Coalfields Ltd (ECL), a subsidiary of Coal India, has commissioned a 250-kilowatt (kW) rooftop solar power project, ramping up its total installed solar rooftop capacity to 692 kW, according to a statement. The project was commissioned on Wednesday, Coal India Ltd (CIL) said in a statement. &#8220;ECL, the West Bengal-located coal-producing subsidiary of Coal India Ltd, commissioned a 250-kW rooftop solar power project on Wednesday ramping up its total installed solar roof top capacity to 692 kW,&#8221; the statement said. The implemented through the Solar Energy Corporation of India (SECI), the newly installed 250 kW plant set up at [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-436704","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/436704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=436704"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/436704\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=436704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=436704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=436704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}