{"id":434272,"date":"2021-09-06T10:18:09","date_gmt":"2021-09-06T04:48:09","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=434272"},"modified":"2021-09-06T11:08:13","modified_gmt":"2021-09-06T05:38:13","slug":"power-grid-corporation-of-india-limited-to-develop-around-11-ev-charging-stations-in-shillong","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/power-grid-corporation-of-india-limited-to-develop-around-11-ev-charging-stations-in-shillong\/","title":{"rendered":"Power Grid Corporation of India Limited to develop around 11 EV charging stations in Shillong"},"content":{"rendered":"<p>Power Grid Corporation of India Limited (POWERGRID NSE -0.71 %) to develop around 11 Electric Vehicle Charging Station (EVCS) in Shillong.<\/p>\n<p>POWERGRID has laid the foundation stone for first ever EVCS in the state of Meghalaya at its office complex yesterday at Lapalang, Shillong.<\/p>\n<p>The EVCS are being developed under Faster Adoption and Manufacturing of (Hybrid) &amp; Electric Vehicles (FAME) India Scheme Phase-II. <\/p>\n<p>Under this scheme, POWERGRID will be developing 11 EVCS in Shillong city (5 Public EVCS and 6 at government establishments). Each station shall have four 15 kW DC-001 Chargers and one 100 kW CCS-2\/CHAdeMO Charger (dual gun) making it 66 charging points in Shillong city. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Grid Corporation of India Limited (POWERGRID NSE -0.71 %) to develop around 11 Electric Vehicle Charging Station (EVCS) in Shillong. POWERGRID has laid the foundation stone for first ever EVCS in the state of Meghalaya at its office complex yesterday at Lapalang, Shillong. The EVCS are being developed under Faster Adoption and Manufacturing of (Hybrid) &amp; Electric Vehicles (FAME) India Scheme Phase-II. Under this scheme, POWERGRID will be developing 11 EVCS in Shillong city (5 Public EVCS and 6 at government establishments). Each station shall have four 15 kW DC-001 Chargers and one 100 kW CCS-2\/CHAdeMO Charger (dual gun) [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-434272","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/434272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=434272"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/434272\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=434272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=434272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=434272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}