{"id":430705,"date":"2021-08-16T08:38:44","date_gmt":"2021-08-16T03:08:44","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=430705"},"modified":"2021-08-16T09:31:14","modified_gmt":"2021-08-16T04:01:14","slug":"tata-power-solar-bags-rs-386-cr-battery-storage-system-project-at-leh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/tata-power-solar-bags-rs-386-cr-battery-storage-system-project-at-leh\/","title":{"rendered":"Tata Power Solar bags Rs 386 cr battery storage system project at Leh"},"content":{"rendered":"<p>Tata Power Solar Systems has received a notice of award to build 50MWp solar PV plant with 50MWh battery energy storage system project at Phyang village in Leh, Ladakh.<\/p>\n<p>The order value is Rs 386 crore and the commercial operation date is set for March 2023. <\/p>\n<p>This will be India&#8217;s first co-located large-scale battery energy storage system solution as well as the first large-scale solar PV project in the union territory of Ladakh to be set up at a high altitude of 3,600 meters above sea level.<\/p>\n<p>The scope of work includes design, engineering, supply and procurement, construction of solar photovoltaic grid-connected power plant project and battery energy storage system on a turnkey basis along with 10 years of operations and maintenance services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tata Power Solar Systems has received a notice of award to build 50MWp solar PV plant with 50MWh battery energy storage system project at Phyang village in Leh, Ladakh. The order value is Rs 386 crore and the commercial operation date is set for March 2023. This will be India&#8217;s first co-located large-scale battery energy storage system solution as well as the first large-scale solar PV project in the union territory of Ladakh to be set up at a high altitude of 3,600 meters above sea level. The scope of work includes design, engineering, supply and procurement, construction of solar [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-430705","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/430705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=430705"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/430705\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=430705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=430705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=430705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}