{"id":430477,"date":"2021-08-13T08:39:22","date_gmt":"2021-08-13T03:09:22","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=430477"},"modified":"2021-08-13T09:04:00","modified_gmt":"2021-08-13T03:34:00","slug":"tata-power-solar-gets-rs-386-crore-pv-plant-project-in-ladakh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/tata-power-solar-gets-rs-386-crore-pv-plant-project-in-ladakh\/","title":{"rendered":"Tata Power Solar gets Rs 386-crore PV plant project in Ladakh"},"content":{"rendered":"<p>Tata Power Solar Systems has been awarded a project to build a solar PV plant with 50MWh Battery Energy Storage System (BESS) in Leh, Ladakh.<\/p>\n<p>The 50MW solar PV plant will be built on EPC (engineering, procurement and construction) mode. <\/p>\n<p>According to a statement by Tata Power, the order value of the project is Rs 386 crore. The commercial operation is expected to start from March 2023.<\/p>\n<p>This will be India&#8217;s first co-located large scale BESS solution as well as first large scale solar PV project in the Union Territory of Ladakh to be set up at a high altitude of 3,600 meters above sea level, it stated.<\/p>\n<p>With the addition of this project, the order pipeline of Tata Power Solar now stands at 4GWp with order value of Rs 12,414 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tata Power Solar Systems has been awarded a project to build a solar PV plant with 50MWh Battery Energy Storage System (BESS) in Leh, Ladakh. The 50MW solar PV plant will be built on EPC (engineering, procurement and construction) mode. According to a statement by Tata Power, the order value of the project is Rs 386 crore. The commercial operation is expected to start from March 2023. This will be India&#8217;s first co-located large scale BESS solution as well as first large scale solar PV project in the Union Territory of Ladakh to be set up at a high altitude [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-430477","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/430477","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=430477"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/430477\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=430477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=430477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=430477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}