{"id":426928,"date":"2021-07-22T10:29:58","date_gmt":"2021-07-22T04:59:58","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=426928"},"modified":"2021-07-22T12:36:27","modified_gmt":"2021-07-22T07:06:27","slug":"rooftop-solar-plant-inaugurated-at-koraput-railway-station","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/rooftop-solar-plant-inaugurated-at-koraput-railway-station\/","title":{"rendered":"Rooftop solar plant inaugurated at Koraput railway station"},"content":{"rendered":"<p>A rooftop solar power plant was commissioned at the Koraput station in Odisha, the East Coast Railway said on Wednesday.<\/p>\n<p>Chief Electrical Engineer Chitta Ranjan Hait inaugurated the 27.5-kilowatt-peak (kWp) plant, which is installed on the sheds at platforms 2 and 3 of the railway station in Koraput district on Tuesday.<\/p>\n<p>Ninety solar panels have been installed in a public-private partnership mode, the railways said in a statement. <\/p>\n<p>The plant will generate 87 units per day, it stated, adding that around Rs 42,000 would be saved per year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A rooftop solar power plant was commissioned at the Koraput station in Odisha, the East Coast Railway said on Wednesday. Chief Electrical Engineer Chitta Ranjan Hait inaugurated the 27.5-kilowatt-peak (kWp) plant, which is installed on the sheds at platforms 2 and 3 of the railway station in Koraput district on Tuesday. Ninety solar panels have been installed in a public-private partnership mode, the railways said in a statement. The plant will generate 87 units per day, it stated, adding that around Rs 42,000 would be saved per year.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-426928","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/426928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=426928"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/426928\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=426928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=426928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=426928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}