{"id":407218,"date":"2021-03-26T10:17:29","date_gmt":"2021-03-26T04:47:29","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=407218"},"modified":"2021-03-26T11:02:16","modified_gmt":"2021-03-26T05:32:16","slug":"bengalurus-kempegowda-airport-becomes-first-in-south-india-to-have-operational-parallel-runways","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bengalurus-kempegowda-airport-becomes-first-in-south-india-to-have-operational-parallel-runways\/","title":{"rendered":"Bengaluru\u2019s Kempegowda airport becomes first in south India to have operational parallel runways"},"content":{"rendered":"<p>With the successful touchdown of an IndiGo flight from Lucknow at the refurbished north runway on Thursday, the Kempegowda International Airport (KIA) in Bengaluru became the first in south India to have operational parallel runways.<\/p>\n<p>It also marked the resumption of flight operations from the north runway, which was closed for renovation and upgrades in June 2020. <\/p>\n<p>A spokesperson for the Bengaluru International Airport Limited (BIAL), which operates KIA, confirmed that approval to begin operations on the north runway was obtained from the Directorate General of Civil Aviation (DGCA). <\/p>\n<p>\u201cWith the CAT IIIB-equipped South Runway becoming operational since December 6, 2019, these enhancements would offer BLR Airport the flexibility to operate both runways in low visibility and adverse weather conditions,\u201d the spokesperson said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the successful touchdown of an IndiGo flight from Lucknow at the refurbished north runway on Thursday, the Kempegowda International Airport (KIA) in Bengaluru became the first in south India to have operational parallel runways. It also marked the resumption of flight operations from the north runway, which was closed for renovation and upgrades in June 2020. A spokesperson for the Bengaluru International Airport Limited (BIAL), which operates KIA, confirmed that approval to begin operations on the north runway was obtained from the Directorate General of Civil Aviation (DGCA). \u201cWith the CAT IIIB-equipped South Runway becoming operational since December 6, [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-407218","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/407218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=407218"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/407218\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=407218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=407218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=407218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}