{"id":403918,"date":"2021-03-09T11:26:32","date_gmt":"2021-03-09T05:56:32","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=403918"},"modified":"2021-03-09T11:26:32","modified_gmt":"2021-03-09T05:56:32","slug":"infra-boost-in-tripura-pm-modi-to-inaugurate-maitri-setu-between-india-bangladesh-along-with-other-projects","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/infra-boost-in-tripura-pm-modi-to-inaugurate-maitri-setu-between-india-bangladesh-along-with-other-projects\/","title":{"rendered":"Infra boost in Tripura! PM Modi to inaugurate \u2018Maitri Setu\u2019 between India-Bangladesh along with other projects"},"content":{"rendered":"<p>On 9 March 2021, PM Narendra Modi is all set to virtually inaugurate \u2018Maitri Setu\u2019 between India and Bangladesh. Besides, he will inaugurate and lay the foundation stone of various infrastructure projects in Tripura as well. The \u2018Maitri Setu\u2019 bridge has been developed over the river Feni, which flows between the Indian boundary in the Northeast state of Tripura and Bangladesh. According to the PMO, the name \u2018Maitri Setu\u2019 symbolizes growing bilateral relations as well as friendly ties between the two nations. The construction work of the bridge was taken up by the National Highways and Infrastructure Development Corporation Limited (NHIDCL) at a cost of Rs 133 crores. The 1.9 Km long Maitri Setu bridge connects Sabroom, India with Ramgarh, Bangladesh.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 9 March 2021, PM Narendra Modi is all set to virtually inaugurate \u2018Maitri Setu\u2019 between India and Bangladesh. Besides, he will inaugurate and lay the foundation stone of various infrastructure projects in Tripura as well. The \u2018Maitri Setu\u2019 bridge has been developed over the river Feni, which flows between the Indian boundary in the Northeast state of Tripura and Bangladesh. According to the PMO, the name \u2018Maitri Setu\u2019 symbolizes growing bilateral relations as well as friendly ties between the two nations. The construction work of the bridge was taken up by the National Highways and Infrastructure Development Corporation Limited [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,197,138],"tags":[],"class_list":["post-403918","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/403918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=403918"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/403918\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=403918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=403918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=403918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}