{"id":401174,"date":"2021-02-19T12:22:12","date_gmt":"2021-02-19T06:52:12","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=401174"},"modified":"2021-02-19T12:22:12","modified_gmt":"2021-02-19T06:52:12","slug":"lt-arm-to-build-2-units-of-kudankulam-nuclear-power-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-arm-to-build-2-units-of-kudankulam-nuclear-power-project\/","title":{"rendered":"L&amp;T arm to build 2 units of Kudankulam Nuclear Power Project"},"content":{"rendered":"<p>The construction arm of L&amp;T has secured an order in the range of Rs 1,000-2,500 crore to construct the Main Plant Civil Works of the Kudankulam 5 and 6 units.<\/p>\n<p>The Kudankulam Nuclear Power Plant is India&#8217;s first Light Water Reactor (LWR) of 6 units with a generation capacity of 1,000 MWe (megawatt electrical) each.<\/p>\n<p>In a regulatory filing, L&amp;T said that the scope of work includes construction of the reactor building, reactor auxiliary building, turbine building, diesel generator building and other safety related structures in a duration of 64 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction arm of L&amp;T has secured an order in the range of Rs 1,000-2,500 crore to construct the Main Plant Civil Works of the Kudankulam 5 and 6 units. The Kudankulam Nuclear Power Plant is India&#8217;s first Light Water Reactor (LWR) of 6 units with a generation capacity of 1,000 MWe (megawatt electrical) each. In a regulatory filing, L&amp;T said that the scope of work includes construction of the reactor building, reactor auxiliary building, turbine building, diesel generator building and other safety related structures in a duration of 64 months.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-401174","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/401174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=401174"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/401174\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=401174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=401174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=401174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}