{"id":401059,"date":"2021-02-18T16:45:12","date_gmt":"2021-02-18T11:15:12","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=401059"},"modified":"2021-02-18T16:45:12","modified_gmt":"2021-02-18T11:15:12","slug":"lt-construction-bags-major-contract-to-build-two-units-of-kudankulam-plant","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-construction-bags-major-contract-to-build-two-units-of-kudankulam-plant\/","title":{"rendered":"L&amp;T Construction bags major contract to build two units of Kudankulam plant"},"content":{"rendered":"<p>The construction arm of L&amp;T has bagged a contract from the Nuclear Power Corporation of India Limited (NPCIL) for civil work at the main plant of Kudankulam Nuclear Power Plant&#8217;s units 5&amp;6 (KNPP 5&amp;6 \u2013 2X1000 MWe) .<\/p>\n<p>While the company did not disclose the value of the order, it generally classifies as significant, if the value is in the range of around Rs 1,000-2,500 crore.<\/p>\n<p>The Kudankulam Nuclear Power Plant is India\u2019s first Light Water Reactor (LWR) of six units with a generation capacity of 1000 MWe each.<\/p>\n<p>The scope of work includes construction of the reactor building, reactor auxiliary building, turbine building, diesel generator building and other safety related structures in span of 64 months.<\/p>\n<p>L&amp;T is currently executing similar work at units 3 and 4 of the plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction arm of L&amp;T has bagged a contract from the Nuclear Power Corporation of India Limited (NPCIL) for civil work at the main plant of Kudankulam Nuclear Power Plant&#8217;s units 5&amp;6 (KNPP 5&amp;6 \u2013 2X1000 MWe) . While the company did not disclose the value of the order, it generally classifies as significant, if the value is in the range of around Rs 1,000-2,500 crore. The Kudankulam Nuclear Power Plant is India\u2019s first Light Water Reactor (LWR) of six units with a generation capacity of 1000 MWe each. The scope of work includes construction of the reactor building, reactor [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-401059","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/401059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=401059"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/401059\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=401059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=401059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=401059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}