{"id":399616,"date":"2021-02-09T11:24:42","date_gmt":"2021-02-09T05:54:42","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=399616"},"modified":"2021-02-09T11:24:42","modified_gmt":"2021-02-09T05:54:42","slug":"fate-of-ntpcs-tapovan-project-hangs-in-balance-after-rs-1500-crore-loss","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/fate-of-ntpcs-tapovan-project-hangs-in-balance-after-rs-1500-crore-loss\/","title":{"rendered":"Fate of NTPC\u2019s Tapovan project hangs in balance after Rs 1,500 crore loss"},"content":{"rendered":"<p>NEW DELHI: The fate of NTPC\u2019s 520-MW Tapovan-Vishnugad hydel project hangs in balance as India\u2019s largest power company is estimated to have suffered a loss of Rs 1,500 crore due to damage to the construction caused by Sunday\u2019s flash flood in Uttarakhand\u2019s Rishiganga river.<\/p>\n<p>The company, however, told the BSE on Monday that the \u201cdamage may not be considered material or significant\u201d as per Sebi norms in the light of overall size of the company&#8217;s operations and its total capacity and \u201cappropriate insurance cover\u201d was available for the losses or damage suffered\u201d.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: The fate of NTPC\u2019s 520-MW Tapovan-Vishnugad hydel project hangs in balance as India\u2019s largest power company is estimated to have suffered a loss of Rs 1,500 crore due to damage to the construction caused by Sunday\u2019s flash flood in Uttarakhand\u2019s Rishiganga river. The company, however, told the BSE on Monday that the \u201cdamage may not be considered material or significant\u201d as per Sebi norms in the light of overall size of the company&#8217;s operations and its total capacity and \u201cappropriate insurance cover\u201d was available for the losses or damage suffered\u201d.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-399616","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/399616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=399616"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/399616\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=399616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=399616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=399616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}