{"id":398728,"date":"2021-02-03T10:18:58","date_gmt":"2021-02-03T04:48:58","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=398728"},"modified":"2021-02-03T10:18:58","modified_gmt":"2021-02-03T04:48:58","slug":"with-an-eye-on-china-budget-sets-ground-for-three-power-gear-production-zones","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/with-an-eye-on-china-budget-sets-ground-for-three-power-gear-production-zones\/","title":{"rendered":"With an eye on China, Budget sets ground for three power gear production zones"},"content":{"rendered":"<p>NEW DELHI : The Union budget presented on Monday created a budget head for setting up \u2018Manufacturing Zones\u2019 under the Atmanirbhar Bharat package.<\/p>\n<p>The notes on Demands for Grants for 2021-2022 states, \u201cThis scheme is for setting up of 3 manufacturing Zones for Power and Renewable equipment to be set up in 3 different States. The manufacturing facilities in the zones shall be based on cutting edge, clean and energy efficient technology for minimizing dependency on import of equipment, critical components, basic raw material, critical spares etc. required for Power sector and renewable.&#8221;<\/p>\n<p>The move to set up dedicated manufacturing zones is primarily aimed at curbing the use of Chinese-made equipment and attracting firms across power generation, distribution and transmission \u2014both in conventional and green energy spaces. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI : The Union budget presented on Monday created a budget head for setting up \u2018Manufacturing Zones\u2019 under the Atmanirbhar Bharat package. The notes on Demands for Grants for 2021-2022 states, \u201cThis scheme is for setting up of 3 manufacturing Zones for Power and Renewable equipment to be set up in 3 different States. The manufacturing facilities in the zones shall be based on cutting edge, clean and energy efficient technology for minimizing dependency on import of equipment, critical components, basic raw material, critical spares etc. required for Power sector and renewable.&#8221; The move to set up dedicated manufacturing [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[139,130,237],"tags":[],"class_list":["post-398728","post","type-post","status-publish","format-standard","hentry","category-live-mint","category-newspapers","category-power-live-mint"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/398728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=398728"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/398728\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=398728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=398728"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=398728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}