{"id":398217,"date":"2021-02-01T09:11:26","date_gmt":"2021-02-01T03:41:26","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=398217"},"modified":"2021-02-01T09:44:24","modified_gmt":"2021-02-01T04:14:24","slug":"state-run-power-grid-corporation-bags-two-power-transmission-projects-in-rajasthan-2","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/state-run-power-grid-corporation-bags-two-power-transmission-projects-in-rajasthan-2\/","title":{"rendered":"State-run Power Grid Corporation bags two power transmission projects in Rajasthan"},"content":{"rendered":"<p>New Delhi: State-run Power Grid Corporation of India (PGCIL) has won two electricity transmission projects in Rajasthan under tariff-based competitive bidding. PGCIL has been declared as the successful bidder under tariff-based competitive bidding to establish two transmission systems, the company said in a BSE filing.<\/p>\n<p>The company, however, did not disclose the value of these two projects.<\/p>\n<p>The firm bagged a &#8220;transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under phase II &#8211; Part A&#8221; on build, own operate and maintain basis. <\/p>\n<p>The transmission system comprises establishment of a new 400\/220kV Substation, 400kV D\/C Transmission lines and associated Substation extension works in Rajasthan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: State-run Power Grid Corporation of India (PGCIL) has won two electricity transmission projects in Rajasthan under tariff-based competitive bidding. PGCIL has been declared as the successful bidder under tariff-based competitive bidding to establish two transmission systems, the company said in a BSE filing. The company, however, did not disclose the value of these two projects. The firm bagged a &#8220;transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under phase II &#8211; Part A&#8221; on build, own operate and maintain basis. The transmission system comprises establishment of a new 400\/220kV Substation, [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-398217","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/398217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=398217"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/398217\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=398217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=398217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=398217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}