{"id":392736,"date":"2021-01-01T10:57:50","date_gmt":"2021-01-01T05:27:50","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=392736"},"modified":"2021-01-01T11:15:52","modified_gmt":"2021-01-01T05:45:52","slug":"bhel-bags-rs-3200-cr-order-for-hydro-electric-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-bags-rs-3200-cr-order-for-hydro-electric-project\/","title":{"rendered":"BHEL bags Rs 3200 cr order for Hydro Electric Project"},"content":{"rendered":"<p>Bharat Heavy Electricals Limited (BHEL) has bagged significant orders, valued at Rs 3,200 Crore, for Electro-Mechanical (E&amp;M) works for a Hydro Electric Project (HEP) in Andhra Pradesh and E&amp;M works of Pump-Motor sets for Lift Irrigation Schemes (LIS) in Telangana. <\/p>\n<p>Significantly, the order for E&amp;M works for 12&#215;80 MW Polavaram HEP in Andhra Pradesh envisages manufacture and supply of India\u2019s highest unit-rating Kaplan hydro turbines. Polavaram HEP, being developed by Andhra Pradesh Power Generation Corporation Limited (APGENCO), is located in the East Godavari district of Andhra Pradesh. <\/p>\n<p>Pump-Motor sets order for LIS projects in Telangana include 15 sets (1,992 MW) for Kaleshwaram LIS and 13 sets (1,885 MW) for Palamuru Rangareddy LIS (package 1 &amp; 16).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bharat Heavy Electricals Limited (BHEL) has bagged significant orders, valued at Rs 3,200 Crore, for Electro-Mechanical (E&amp;M) works for a Hydro Electric Project (HEP) in Andhra Pradesh and E&amp;M works of Pump-Motor sets for Lift Irrigation Schemes (LIS) in Telangana. Significantly, the order for E&amp;M works for 12&#215;80 MW Polavaram HEP in Andhra Pradesh envisages manufacture and supply of India\u2019s highest unit-rating Kaplan hydro turbines. Polavaram HEP, being developed by Andhra Pradesh Power Generation Corporation Limited (APGENCO), is located in the East Godavari district of Andhra Pradesh. Pump-Motor sets order for LIS projects in Telangana include 15 sets (1,992 MW) [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,244,144],"tags":[],"class_list":["post-392736","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/392736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=392736"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/392736\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=392736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=392736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=392736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}