{"id":378247,"date":"2020-10-14T08:41:21","date_gmt":"2020-10-14T03:11:21","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=378247"},"modified":"2020-10-14T09:13:45","modified_gmt":"2020-10-14T03:43:45","slug":"mumbai-blackout-all-you-should-know-about-worst-power-failure-in-decades","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/mumbai-blackout-all-you-should-know-about-worst-power-failure-in-decades\/","title":{"rendered":"Mumbai blackout: All you should know about worst power failure in decades"},"content":{"rendered":"<p>Power supply was restored in most parts of Mumbai after it suffered a power failure at around 10 am on Monday. Train services came to a halt, homes and businesses were without electricity and people sweltered in humid heat as a grid failure resulted in massive power outages across Mumbai Monday morning. <\/p>\n<p>The reason behind <\/p>\n<p>Electric supply in Mumbai was interrupted due to Tata&#8217;s incoming electric supply failure, confirmed Brihanmumbai Electric Supply and Transport.  Tata Power, which is into both generation and distribution, attributed the outage to a simultaneous substation tripping at 1010 hrs at state-run transmission company MSETCL&#8217;s two substations in the suburbs of Kalwa and Kharghar.   Maintenance work was on in MSETCL&#8217;s 400 kv Kalwa-Padgha line when the technical fault happened in circuit number 2, which was taking the entire load at the time as circuit 1 was shut.      <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power supply was restored in most parts of Mumbai after it suffered a power failure at around 10 am on Monday. Train services came to a halt, homes and businesses were without electricity and people sweltered in humid heat as a grid failure resulted in massive power outages across Mumbai Monday morning. The reason behind Electric supply in Mumbai was interrupted due to Tata&#8217;s incoming electric supply failure, confirmed Brihanmumbai Electric Supply and Transport. Tata Power, which is into both generation and distribution, attributed the outage to a simultaneous substation tripping at 1010 hrs at state-run transmission company MSETCL&#8217;s two [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-378247","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/378247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=378247"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/378247\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=378247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=378247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=378247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}