{"id":377886,"date":"2020-10-12T15:29:10","date_gmt":"2020-10-12T09:59:10","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=377886"},"modified":"2020-10-12T15:29:10","modified_gmt":"2020-10-12T09:59:10","slug":"simultaneous-tripping-at-msetcl-facilities-caused-power-outage-tata-power","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/simultaneous-tripping-at-msetcl-facilities-caused-power-outage-tata-power\/","title":{"rendered":"Simultaneous tripping at MSETCL facilities caused power outage: Tata Power"},"content":{"rendered":"<p>Tata Power  on Monday said there was &#8220;simultaneous substation tripping&#8221; at state-run MSETCL&#8217;s two facilities, which led to a major power outage in the financial capital and surrounding areas.<\/p>\n<p>It said the tripping at the Kalwa and Kharghar sub-stations at 1010 hours caused a huge dip in frequency in the Mumbai transmission system, leading to the tripping of power supply.<\/p>\n<p>Trains came to a halt and other activity was also grounded due to what was labelled as a grid failure by officials.<\/p>\n<p>&#8220;Restoration work is in progress to bring supply from the 3 Hydro units and Trombay units once the MSETCL (Maharashtra state electric transmission company) transmission lines are connected,&#8221; the Tata Power statement said.<\/p>\n<p>Earlier, Western Railway and state-run discom BEST Electricity had said there was a failure at Tata Power&#8217;s end, leading to the outages.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tata Power on Monday said there was &#8220;simultaneous substation tripping&#8221; at state-run MSETCL&#8217;s two facilities, which led to a major power outage in the financial capital and surrounding areas. It said the tripping at the Kalwa and Kharghar sub-stations at 1010 hours caused a huge dip in frequency in the Mumbai transmission system, leading to the tripping of power supply. Trains came to a halt and other activity was also grounded due to what was labelled as a grid failure by officials. &#8220;Restoration work is in progress to bring supply from the 3 Hydro units and Trombay units once the [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-377886","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/377886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=377886"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/377886\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=377886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=377886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=377886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}