{"id":374514,"date":"2020-09-22T08:31:43","date_gmt":"2020-09-22T03:01:43","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=374514"},"modified":"2020-09-22T09:13:19","modified_gmt":"2020-09-22T03:43:19","slug":"lt-starts-commissioning-of-99-mw-singoli-bhatwari-hydel-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-starts-commissioning-of-99-mw-singoli-bhatwari-hydel-project\/","title":{"rendered":"L&amp;T starts commissioning of 99 MW Singoli-Bhatwari hydel project"},"content":{"rendered":"<p>Larsenand Toubro on Monday said it has begun commissioning of the 99-megawatt Singoli-Bhatwari hydroelectric plant in Uttarakhand. <\/p>\n<p>Situated about 25 km from Rudraprayag, the run-of-the-river plant is capable of providing over 400 million units of renewable energy per annum along the Char Dham route. <\/p>\n<p>The plant features a barrage, with a medium-sized intake pond near Ukhimath, a 12-km long headrace tunnel, and a surge shaft over 180 metre in depth, Larsen and Toubro said in a release. <\/p>\n<p>The plant is devoid of any rehabilitation and resettlement issues. <\/p>\n<p>The wet commissioning process starts with machine spinning of the turbines initially without generation of electricity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Larsenand Toubro on Monday said it has begun commissioning of the 99-megawatt Singoli-Bhatwari hydroelectric plant in Uttarakhand. Situated about 25 km from Rudraprayag, the run-of-the-river plant is capable of providing over 400 million units of renewable energy per annum along the Char Dham route. The plant features a barrage, with a medium-sized intake pond near Ukhimath, a 12-km long headrace tunnel, and a surge shaft over 180 metre in depth, Larsen and Toubro said in a release. The plant is devoid of any rehabilitation and resettlement issues. The wet commissioning process starts with machine spinning of the turbines initially without [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-374514","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/374514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=374514"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/374514\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=374514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=374514"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=374514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}