{"id":372517,"date":"2020-09-08T12:09:26","date_gmt":"2020-09-08T06:39:26","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=372517"},"modified":"2020-09-08T12:26:08","modified_gmt":"2020-09-08T06:56:08","slug":"after-90-days-assams-baghjan-gas-well-fire-doused-blazes-again-after-glitch","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/after-90-days-assams-baghjan-gas-well-fire-doused-blazes-again-after-glitch\/","title":{"rendered":"After 90 days, Assam\u2019s Baghjan gas-well fire doused; blazes again after glitch"},"content":{"rendered":"<p>Experts attempting to douse the blaze at an Oil India Limited (OIL) natural gas well in Assam\u2019s Baghjan, which had a blowout on May 27 and caught fire on June 9, had temporary success on Monday and were able to put out the flames for nearly eight hours.<\/p>\n<p>According to OIL officials, effort to divert the gas from the well to flare pits to the Early Production System (EPS) was successful and led to dousing of the blaze. But due to technical issues, the blow out preventer (BoP) ram was opened and the fire started again.<\/p>\n<p>\u201cThe fire was doused for eight hours. But considering observed leakage through wellhead, it was decided for the well\u2019s safety to open the BoP ram and flare the gas through it as was the case earlier. Experts will explore the possibility of welding the leakage point,\u201d OIL spokesperson Tridiv Hazarika said.<\/p>\n<p>On August 17, foreign experts engaged by OIL were able to cap the well by placing a BO stack over the wellhead. But problems surfaced two days later when attempts were made to douse the fire by \u2018killing the well\u2019. The operation was suspended on August 19 following rupture of a casing valve.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Experts attempting to douse the blaze at an Oil India Limited (OIL) natural gas well in Assam\u2019s Baghjan, which had a blowout on May 27 and caught fire on June 9, had temporary success on Monday and were able to put out the flames for nearly eight hours. According to OIL officials, effort to divert the gas from the well to flare pits to the Early Production System (EPS) was successful and led to dousing of the blaze. But due to technical issues, the blow out preventer (BoP) ram was opened and the fire started again. \u201cThe fire was doused [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[141,130,183],"tags":[],"class_list":["post-372517","post","type-post","status-publish","format-standard","hentry","category-hindustantimes","category-newspapers","category-oil-gas-hindustantimes"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/372517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=372517"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/372517\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=372517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=372517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=372517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}