{"id":371328,"date":"2020-09-02T11:01:15","date_gmt":"2020-09-02T05:31:15","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=371328"},"modified":"2020-09-02T11:54:30","modified_gmt":"2020-09-02T06:24:30","slug":"cmeri-installs-massive-solar-tree-claims-it-is-the-largest-in-the-world","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/cmeri-installs-massive-solar-tree-claims-it-is-the-largest-in-the-world\/","title":{"rendered":"CMERI installs massive solar tree, claims it is the &#8216;largest in the world&#8217;"},"content":{"rendered":"<p>The Central Mechanical Engineering Research Institute (CMERI) based in West Bengal\u2019s Durgapur has developed a massive solar tree at its residential complex.<\/p>\n<p>Speaking to DH, CMERI Director Professor Harish Hirani said that it is the largest solar tree in the world with capacity of generating more than 40 to 45 kilowatts hour per day, which is significantly higher than the current estimated highest capacity of 40 kilowatts hour per day. CMERI is a Central government institute working under the Council of Scientific and Industrial Research (CSIR).<\/p>\n<p>\u201cIt has the annual capacity to generate 12,000-14,000 units of clean and green power,\u201d said Hirani. He also said that the solar tree has 35 photovoltaic solar panels which are designed in a manner to ensure maximum exposure of each panel to sunlight and least shadow area beneath the structure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Central Mechanical Engineering Research Institute (CMERI) based in West Bengal\u2019s Durgapur has developed a massive solar tree at its residential complex. Speaking to DH, CMERI Director Professor Harish Hirani said that it is the largest solar tree in the world with capacity of generating more than 40 to 45 kilowatts hour per day, which is significantly higher than the current estimated highest capacity of 40 kilowatts hour per day. CMERI is a Central government institute working under the Council of Scientific and Industrial Research (CSIR). \u201cIt has the annual capacity to generate 12,000-14,000 units of clean and green power,\u201d [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[146,130,234],"tags":[],"class_list":["post-371328","post","type-post","status-publish","format-standard","hentry","category-deccan-herald-newspapers","category-newspapers","category-power-deccan-herald-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/371328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=371328"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/371328\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=371328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=371328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=371328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}