{"id":369220,"date":"2020-08-22T09:17:22","date_gmt":"2020-08-22T03:47:22","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=369220"},"modified":"2020-08-22T09:53:28","modified_gmt":"2020-08-22T04:23:28","slug":"road-made-from-plastic-waste-will-come-up-soon-in-ups-noida-officials","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/road-made-from-plastic-waste-will-come-up-soon-in-ups-noida-officials\/","title":{"rendered":"Road made from plastic waste will come up soon in UP&#8217;s Noida: Officials"},"content":{"rendered":"<p>A 500-metre long road stretch made from plastic waste will soon come up in Uttar Pradesh&#8217;s Noida as a pilot project, officials said on Friday. <\/p>\n<p>The 12-metre wide road stretch is proposed to come up in Sector 129, parallel to the Noida-Greater Noida Expressway and the project is expected to be completed by Mahatma Gandhi&#8217;s birth anniversary on October 2, the officials said. <\/p>\n<p>A memorandum of agreement for this was signed on Friday between the Noida Authority and Bharat Petroleum Corporation Limited as part of &#8216;Swachh Bharat Mission&#8217;, they said. <\/p>\n<p>&#8220;The road stretch would be 500-metre long and 12 metre wide, covering 6,000 sq metre area in total. The entire stretch would be made of used and waste plastic in a bid to reduce pollution through plastic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 500-metre long road stretch made from plastic waste will soon come up in Uttar Pradesh&#8217;s Noida as a pilot project, officials said on Friday. The 12-metre wide road stretch is proposed to come up in Sector 129, parallel to the Noida-Greater Noida Expressway and the project is expected to be completed by Mahatma Gandhi&#8217;s birth anniversary on October 2, the officials said. A memorandum of agreement for this was signed on Friday between the Noida Authority and Bharat Petroleum Corporation Limited as part of &#8216;Swachh Bharat Mission&#8217;, they said. &#8220;The road stretch would be 500-metre long and 12 metre [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,168],"tags":[],"class_list":["post-369220","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-roads-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/369220","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=369220"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/369220\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=369220"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=369220"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=369220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}