{"id":36333,"date":"2015-10-06T11:43:45","date_gmt":"2015-10-06T11:43:45","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=36333"},"modified":"2015-10-06T11:43:45","modified_gmt":"2015-10-06T11:43:45","slug":"wind-turbine-manufacturer-suzlon-bags-100-8-mw-repeat-order-from-orange-renewable","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/wind-turbine-manufacturer-suzlon-bags-100-8-mw-repeat-order-from-orange-renewable\/","title":{"rendered":"Wind turbine manufacturer Suzlon bags 100.8 MW repeat order from Orange Renewable"},"content":{"rendered":"<p>Wind turbine manufacturer Suzlon group today said it has won a repeat turnkey order for 100.8 mega watt (MW) from Orange Renewable which will be installed at a wind park in Andhra Pradesh. <\/p>\n<p>&#8220;Suzlon Group has won a repeat turnkey order for 100.8 MW from Orange Renewable, an independent power producer (IPP), to be installed in a wind park in Beluguppa, Andhra Pradesh. The project will be commissioned starting financial year 2016-17,&#8221; the company said in a BSE filing. <\/p>\n<p>The company further said it will offer operation and maintenance services for an initial period of 12 years through an integrated package. <\/p>\n<p>The wind park comprises 48 wind turbine generators of Suzlon&#8217;s S111 90m, 2.1 MW wind turbines. <\/p>\n<p>Orange Renewable is a developer and operator of renewable energy projects and a 100 per cent subsidiary of AT Holdings Pte Ltd, Singapore. <\/p>\n<p>Shares of Suzlon Energy were trading at Rs 22.40, up 3.23 per cent in the late morning deals.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wind turbine manufacturer Suzlon group today said it has won a repeat turnkey order for 100.8 mega watt (MW) from Orange Renewable which will be installed at a wind park in Andhra Pradesh. &#8220;Suzlon Group has won a repeat turnkey order for 100.8 MW from Orange Renewable, an independent power producer (IPP), to be installed in a wind park in Beluguppa, Andhra Pradesh. The project will be commissioned starting financial year 2016-17,&#8221; the company said in a BSE filing. The company further said it will offer operation and maintenance services for an initial period of 12 years through an integrated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-36333","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/36333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=36333"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/36333\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=36333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=36333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=36333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}