{"id":358804,"date":"2020-06-23T11:06:10","date_gmt":"2020-06-23T05:36:10","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=358804"},"modified":"2020-06-23T11:29:07","modified_gmt":"2020-06-23T05:59:07","slug":"gorakhpur-link-expressway-faster-connectivity-from-lucknow-agra-delhi-with-6-lane-91-3-km-long-expressway","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/gorakhpur-link-expressway-faster-connectivity-from-lucknow-agra-delhi-with-6-lane-91-3-km-long-expressway\/","title":{"rendered":"Gorakhpur Link Expressway: Faster connectivity from Lucknow, Agra &amp; Delhi with 6-lane 91.3 km long expressway"},"content":{"rendered":"<p>Gorakhpur Link Expressway: In a major boost to roadways infrastructure in Uttar Pradesh, Gorakhpur Link Expressway will be ready for the operation soon at a cost of over Rs 5,876.68 crore. The expressway will ensure hasslefree movement of vehicular traffic from Delhi, Lucknow and Agra, Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) stated, as per ANI report. The Gorakhpur Link Expressway, once completed, will provide better commuter experience and faster connectivity, UPEIDA has said. <\/p>\n<p>Gorakhpur Link Expressway in Uttar Pradesh: Top facts <\/p>\n<p>1. The total length of Gorakhpur Link Expressway will be 91.352 km long. <\/p>\n<p>2. The cost of the six-lane Gorakhpur Link Expressway project is estimated at Rs 5,876.68 crore, as per ANI report. The budget also includes land cost.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gorakhpur Link Expressway: In a major boost to roadways infrastructure in Uttar Pradesh, Gorakhpur Link Expressway will be ready for the operation soon at a cost of over Rs 5,876.68 crore. The expressway will ensure hasslefree movement of vehicular traffic from Delhi, Lucknow and Agra, Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) stated, as per ANI report. The Gorakhpur Link Expressway, once completed, will provide better commuter experience and faster connectivity, UPEIDA has said. Gorakhpur Link Expressway in Uttar Pradesh: Top facts 1. The total length of Gorakhpur Link Expressway will be 91.352 km long. 2. The cost of the [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,197,138],"tags":[],"class_list":["post-358804","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/358804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=358804"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/358804\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=358804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=358804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=358804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}