{"id":345477,"date":"2020-04-06T10:51:53","date_gmt":"2020-04-06T05:21:53","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=345477"},"modified":"2020-04-06T10:51:53","modified_gmt":"2020-04-06T05:21:53","slug":"as-candles-are-ready-to-be-lit-at-9-pm-power-utilities-asking-people-to-switch-off-only-lights","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/as-candles-are-ready-to-be-lit-at-9-pm-power-utilities-asking-people-to-switch-off-only-lights\/","title":{"rendered":"As candles are ready to be lit at 9 pm, power utilities asking people to switch off only lights"},"content":{"rendered":"<p>BENGALURU: The Power System Operation Corporation (Posoco) which operates the national load dispatch centre expects the load to fall by 12,879 MW across the five regions during the nine-minute light switch-off event this evening, according to its advisory to state load dispatch centres. The Posoco has advised load managers to go for a graded reduction in generation to prepare the grid for the nine-minute event which will begin at 9 pm.<\/p>\n<p>Indian grid system is designed to operate at a frequency of 50 Hz (or cycles per second). A sharp drop below this level or a sharp rise above this level will hamper the grid stability. If the fall or rise is too sharp, it can set off a series of tripping of transmission lines resulting in outage of generating stations. Sharp fall in frequency used to be a general occurrence in the summer months in the 1990s with one state or the other within a region overdrawing from the grid causing the frequency to fall to precarious levels. It is another matter that such rogue states had to pay a fine. The trend, however, became a thing of the past after the power sector moved to merit-order dispatch or availability based tariff. In other words, tariffs payable by utilities is linked to the frequency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU: The Power System Operation Corporation (Posoco) which operates the national load dispatch centre expects the load to fall by 12,879 MW across the five regions during the nine-minute light switch-off event this evening, according to its advisory to state load dispatch centres. The Posoco has advised load managers to go for a graded reduction in generation to prepare the grid for the nine-minute event which will begin at 9 pm. Indian grid system is designed to operate at a frequency of 50 Hz (or cycles per second). A sharp drop below this level or a sharp rise above this [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-345477","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/345477","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=345477"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/345477\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=345477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=345477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=345477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}