{"id":339518,"date":"2020-02-28T12:51:47","date_gmt":"2020-02-28T07:21:47","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=339518"},"modified":"2020-02-28T12:51:47","modified_gmt":"2020-02-28T07:21:47","slug":"piped-gas-remains-a-pipe-dream-for-horamavu-residents","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/piped-gas-remains-a-pipe-dream-for-horamavu-residents\/","title":{"rendered":"Piped gas remains a pipe dream for Horamavu residents"},"content":{"rendered":"<p>BENGALURU: A desire for cheaper and safer Piped Natural Gas (PNG) for cooking goaded many families in Horamavu to sign up for it when Gail Gas Limited (GGL) came calling. It\u2019s been two years since they first evinced interest, but the residents are still waiting. The need for permission from the Railways, as one stretch of pipes had to be laid beneath a railway underpass, as well as the damage done to the laid pipelines by a Bangalore Water Supply and Sewerage Board (BWSSB) contractor, has ensured that the gas supply is yet to start. <\/p>\n<p>The delay irked senior citizen Kochusankar, the president of the Trinity Enclave Residents Association, that he filed an RTI application questioning the GGL on the reasons for the delay. The response from GAIL\u2019s technical team (on November 19, 2019) was that the pipeline laying could not be completed as the Railways was yet to okay the portion passing through the underpass. It could take up to six to eight months, the response added. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU: A desire for cheaper and safer Piped Natural Gas (PNG) for cooking goaded many families in Horamavu to sign up for it when Gail Gas Limited (GGL) came calling. It\u2019s been two years since they first evinced interest, but the residents are still waiting. The need for permission from the Railways, as one stretch of pipes had to be laid beneath a railway underpass, as well as the damage done to the laid pipelines by a Bangalore Water Supply and Sewerage Board (BWSSB) contractor, has ensured that the gas supply is yet to start. The delay irked senior citizen [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,207,143],"tags":[],"class_list":["post-339518","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-oil-gas-the-new-indian-express","category-the-new-indian-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/339518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=339518"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/339518\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=339518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=339518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=339518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}