{"id":33363,"date":"2015-09-16T10:26:34","date_gmt":"2015-09-16T10:26:34","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=33363"},"modified":"2015-09-16T10:26:34","modified_gmt":"2015-09-16T10:26:34","slug":"lt-gets-rs-1700-cr-job-order-to-build-bangladesh-power-plant","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-gets-rs-1700-cr-job-order-to-build-bangladesh-power-plant\/","title":{"rendered":"L&#038;T gets Rs 1,700-cr job order to build Bangladesh power plant"},"content":{"rendered":"<p>Engineering and construction major Larsen &#038; Toubro (L&#038;T) today said it has bagged a Rs 1,700 crore order from Japan&#8217;s Marubeni Corporation to set up a 400-Mw gas-based power plant in Bangladesh.<\/p>\n<p>&#8220;Bangladesh Power Development Board awarded the EPC contract for setting up the 400-mega watt (Mw) gas-based power plant project to Marubeni Corporation of Japan, which in turn awarded the EPC sub contract to L&#038;T on a turnkey basis,&#8221; L&#038;T said in a BSE filing.<\/p>\n<p>The company said its scope of work includes design, detailed engineering, supply, installation and commissioning of the complete power plant.<\/p>\n<p>The project, located at Nabiganj Upzilla in Habibganj district, will be executed by L&#038;T Power&#8217;s gas-based power projects business unit based in Baroda.<\/p>\n<p>The stock was trading at Rs 1,541.85 on BSE, down 0.97 per cent.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineering and construction major Larsen &#038; Toubro (L&#038;T) today said it has bagged a Rs 1,700 crore order from Japan&#8217;s Marubeni Corporation to set up a 400-Mw gas-based power plant in Bangladesh. &#8220;Bangladesh Power Development Board awarded the EPC contract for setting up the 400-mega watt (Mw) gas-based power plant project to Marubeni Corporation of Japan, which in turn awarded the EPC sub contract to L&#038;T on a turnkey basis,&#8221; L&#038;T said in a BSE filing. The company said its scope of work includes design, detailed engineering, supply, installation and commissioning of the complete power plant. The project, located at [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-33363","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/33363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=33363"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/33363\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=33363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=33363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=33363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}