{"id":30973,"date":"2015-08-27T11:39:48","date_gmt":"2015-08-27T11:39:48","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=30973"},"modified":"2015-08-27T11:39:48","modified_gmt":"2015-08-27T11:39:48","slug":"solar-pact-with-sunedision-still-in-force-says-adani-enterprises-ltd","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/solar-pact-with-sunedision-still-in-force-says-adani-enterprises-ltd\/","title":{"rendered":"Solar pact with SunEdision still in force, says Adani Enterprises Ltd"},"content":{"rendered":"<p>Adani Enterprises Ltd today said that the memorandum of understanding (MoU), which it entered with the US-based SunEdision to set up a solar photovoltaic manufacturing facility in Gujarat, is still in force. <\/p>\n<p>Company&#8217;s statement came in reply to the clarification sought by the leading exchange BSE on reports that Adani and SunEdison may drop joint venture plans. <\/p>\n<p>Adani Enterprises had earlier entered into a pact with the US-based SunEdison for setting up a solar photovoltaic manufacturing unit in Gujarat at an investment of around Rs 25,000 crore that will create 20,000 jobs. <\/p>\n<p>&#8220;The MoU signed with SunEdision on December 30, 2014 is still subsisting,&#8221; Adani Enterprises said in a regulatory filing today. <\/p>\n<p>Adani and SunEdison was to establish a joint venture for building the largest vertically integrated solar photovoltaic manufacturing facility in the country, a statement issued by the Adani Group had said earlier. <\/p>\n<p>The JV will build the solar facility with an investment of around $4 billion (around Rs 25,000 crore). <\/p>\n<p>&#8220;The facility will create enough solar panels to fuel substantial solar growth in India, furthering India&#8217;s goals for clean, renewable energy independence. <\/p>\n<p>&#8220;India has embarked on an ambitious programme to become a world leader in power generation from renewable technologies, and sees solar as a key part in realising that goal,&#8221; Adani Power CEO Vneet S Jaain had said. <\/p>\n<p>This facility will vertically integrate all aspects of solar panel production on site, including Polysilicon refining, ingots, wafers, cells and panels production with a broader ecosystem involving extended supply chain for raw materials and consumables. <\/p>\n<p>The facility, to be set up Mundra in three years time, will &#8220;create ultra-low cost&#8221; solar panels. <\/p>\n<p>&#8220;We are proud to partner with Adani Enterprises to build the largest solar photovoltaic manufacturing facility in India.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Adani Enterprises Ltd today said that the memorandum of understanding (MoU), which it entered with the US-based SunEdision to set up a solar photovoltaic manufacturing facility in Gujarat, is still in force. Company&#8217;s statement came in reply to the clarification sought by the leading exchange BSE on reports that Adani and SunEdison may drop joint venture plans. Adani Enterprises had earlier entered into a pact with the US-based SunEdison for setting up a solar photovoltaic manufacturing unit in Gujarat at an investment of around Rs 25,000 crore that will create 20,000 jobs. &#8220;The MoU signed with SunEdision on December 30, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-30973","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/30973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=30973"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/30973\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=30973"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=30973"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=30973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}