{"id":30967,"date":"2015-08-27T11:38:24","date_gmt":"2015-08-27T11:38:24","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=30967"},"modified":"2015-08-27T11:38:24","modified_gmt":"2015-08-27T11:38:24","slug":"india-to-get-first-fast-reactor-fuel-reprocessing-plant-in-tn-for-rs-9600-crore","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/india-to-get-first-fast-reactor-fuel-reprocessing-plant-in-tn-for-rs-9600-crore\/","title":{"rendered":"India to get first fast reactor fuel reprocessing plant in TN for Rs 9,600 crore"},"content":{"rendered":"<p>The foundation for India&#8217;s first fast reactor fuel reprocessing plant to be built at a cost of Rs 9,600 crore is expected to be laid in two months&#8217; time at Kalpakkam in Tamil Nadu, a top official has said. <\/p>\n<p>&#8220;The soil excavation work for the fuel reprocessing plants is almost over as the rocky layer has been reached. In two months&#8217; time, the foundation for the reprocessing plants would be laid,&#8221; P.R. Vasudeva Rao, director, Indira Gandhi Centre for Atomic Research (IGCAR) told IANS in an interview. <\/p>\n<p>Rao said the FRFCF will be the first of its kind plant dedicated solely to reprocessing fast reactor fuels to cater to a commercial-sized reactor. <\/p>\n<p>He said the foundation has been laid for some of the administrative buildings connected to the Rs.9,600crore Fast Reactor Fuel Cycle Facility (FRFCF). <\/p>\n<p>Though FRFCF will have only fuel reprocessing plants and not a reactor, Rao said the plant buildings have to be seismically qualified and hence the need for deep excavation. <\/p>\n<p>Similarly all other safety aspects are being considered and incorporated in the project construction stage. <\/p>\n<p>Rao said action on tenders for nearly 50 percent of the total project cost is under progress. <\/p>\n<p>He said orders for long delivery machinery and equipment worth around Rs.500 crore have been placed till date. <\/p>\n<p>&#8220;The facility is slated to be commissioned towards the end of 2019,&#8221; Rao said. <\/p>\n<p>Rao said around Rs.500 crore would be spent on the project this fiscal. <\/p>\n<p>IGCAR, as per its mandate, designed and developed the 500 MW prototype fast breeder reactor (PFBR) which is now being built by Bharatiya Nabhikiya Vidyut Nigam Ltd (BHAVINI) at Kalpakkam. <\/p>\n<p>A fast-breeder reactor is one which breeds more material for a nuclear fission reaction than it consumes. It is the key to India&#8217;s three-stage nuclear power programme. <\/p>\n<p>The purpose of FRFCF is to reprocess the spent fuel of PFBR and also other two fast reactors expected to come up at Kalpakkam, around 70 km from here. <\/p>\n<p>According to Rao, the FRFCF can, with little augmentation, reprocess the spent fuel from the additional fast reactors that would come up. <\/p>\n<p>As to the FRFCF&#8217;s fuel reprocessing capacity, Rao said every eighth month one-third of the PFBR&#8217;s 181 fuel sub-assemblies have to be taken out of the reactor for reprocessing and new fuel sub-assemblies loaded in. <\/p>\n<p>The FRFCF is expected to employ around 1,500-2,000 people and Rao said work on building residential quarters for the employees is also progressing simultaneously. <\/p>\n<p>He said the FRFCF is designed by IGCAR, Nuclear Fuel Complex, Hyderabad and Bhabha Atomic Research Centre (BARC), Mumbai. <\/p>\n<p>&#8220;The FRFCF is not water-intensive and plans are there to meet the water needs through desalination plants,&#8221; Rao said. <\/p>\n<p>He said IGCAR would shortly commission a new two million gallons per day desalination plant built an outlay of around Rs.40 crore. <\/p>\n<p>&#8220;We have the experience in reprocessing fast reactor fuel used in fast breeder test reactor (FBTR) at IGCAR,&#8221; Rao said. <\/p>\n<p>Asked about the finalisation of reactor design for the next two fast reactors, Rao said the design is yet to be finally approved. <\/p>\n<p>He said the new fast reactor design would not only incorporate the learning from PFBR but also ensure that the design is cost-effective. <\/p>\n<p>&#8220;The new design is expected to reduce the material cost at least by 10 percent as compared to PFBR,&#8221; Rao said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The foundation for India&#8217;s first fast reactor fuel reprocessing plant to be built at a cost of Rs 9,600 crore is expected to be laid in two months&#8217; time at Kalpakkam in Tamil Nadu, a top official has said. &#8220;The soil excavation work for the fuel reprocessing plants is almost over as the rocky layer has been reached. In two months&#8217; time, the foundation for the reprocessing plants would be laid,&#8221; P.R. Vasudeva Rao, director, Indira Gandhi Centre for Atomic Research (IGCAR) told IANS in an interview. Rao said the FRFCF will be the first of its kind plant dedicated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133],"tags":[],"class_list":["post-30967","post","type-post","status-publish","format-standard","hentry","category-oil-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/30967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=30967"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/30967\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=30967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=30967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=30967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}