{"id":308220,"date":"2020-01-02T10:19:12","date_gmt":"2020-01-02T04:49:12","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=308220"},"modified":"2020-01-02T10:38:49","modified_gmt":"2020-01-02T05:08:49","slug":"adani-green-hits-life-time-high-on-commissioning-of-wind-power-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/adani-green-hits-life-time-high-on-commissioning-of-wind-power-project\/","title":{"rendered":"Adani Green hits life-time high on commissioning of wind power project"},"content":{"rendered":"<p>Shares of Adani Green Energy (AGEL) hit a new high of Rs 175, having been locked in the upper circuit band of 5 per cent on the BSE for the third straight day, after the company commissioned 75 MW wind power project. <\/p>\n<p>In the past four months, the stock of the Adani Group Company zoomed 300 per cent from a level of Rs 44 on the BSE. In comparison, the S&amp;P BSE Sensex rallied 13 per cent during the same period. <\/p>\n<p>\u201cAdani Renewable Energy (GJ), a stepdown subsidiary of Adani Green Energy has commissioned its 75 MW wind power project having power purchase agreement (&#8220;PPA&#8221;) with Maharashtra State Electricity Distribution Company (MSEDCL) at Rs 2.85\/kWh for a period of 25 years,\u201d the company said in a regulatory filing.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shares of Adani Green Energy (AGEL) hit a new high of Rs 175, having been locked in the upper circuit band of 5 per cent on the BSE for the third straight day, after the company commissioned 75 MW wind power project. In the past four months, the stock of the Adani Group Company zoomed 300 per cent from a level of Rs 44 on the BSE. In comparison, the S&amp;P BSE Sensex rallied 13 per cent during the same period. \u201cAdani Renewable Energy (GJ), a stepdown subsidiary of Adani Green Energy has commissioned its 75 MW wind power project [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-308220","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/308220","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=308220"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/308220\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=308220"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=308220"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=308220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}