{"id":307701,"date":"2019-12-28T11:56:22","date_gmt":"2019-12-28T06:26:22","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=307701"},"modified":"2019-12-28T11:58:41","modified_gmt":"2019-12-28T06:28:41","slug":"bhel-renovates-one-unit-of-3x60-mw-baira-siul-hydro-power","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-renovates-one-unit-of-3x60-mw-baira-siul-hydro-power\/","title":{"rendered":"BHEL renovates one unit of 3&#215;60 MW Baira Siul Hydro Power"},"content":{"rendered":"<p>Bharat Heavy Electricals Limited (BHEL) has successfully renovated and modernised one unit of the 3&#215;60 MW Baira Siul Hydro Power in Himachal Pradesh. Notably, Baira Siul is the first hydro station of NHPC Ltd to have been taken up for comprehensive Renovation &amp; Modernisation (R&amp; M).<\/p>\n<p>Significantly, BHEL won the order for R&amp; M of three units of the Baira Siul Hydro Power Station located in Chamba district of Himachal Pradesh, amidst stiff competitive bidding. R&amp; M of the other two units is under various stages of execution.<\/p>\n<p>BHEL\u2019s scope in the project comprises design, manufacture, supply, replacement and commissioning of critical parts of Turbines &amp; auxiliaries, Governors, Generators and Control &amp; Monitoring. The equipment has been supplied from BHEL\u2019s manufacturing units at Bhopal, Bengaluru and Jhansi, while the on-site installation activities were carried out by the company\u2019s Power Sector \u2014Northern Region division, Noida.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bharat Heavy Electricals Limited (BHEL) has successfully renovated and modernised one unit of the 3&#215;60 MW Baira Siul Hydro Power in Himachal Pradesh. Notably, Baira Siul is the first hydro station of NHPC Ltd to have been taken up for comprehensive Renovation &amp; Modernisation (R&amp; M). Significantly, BHEL won the order for R&amp; M of three units of the Baira Siul Hydro Power Station located in Chamba district of Himachal Pradesh, amidst stiff competitive bidding. R&amp; M of the other two units is under various stages of execution. BHEL\u2019s scope in the project comprises design, manufacture, supply, replacement and commissioning [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,244,144],"tags":[],"class_list":["post-307701","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/307701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=307701"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/307701\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=307701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=307701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=307701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}