{"id":307353,"date":"2019-12-26T12:17:54","date_gmt":"2019-12-26T06:47:54","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=307353"},"modified":"2019-12-26T12:22:24","modified_gmt":"2019-12-26T06:52:24","slug":"ntpc-to-invest-rs-50000-crore-to-add-10gw-solar-energy-capacity-by-2022-2","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/ntpc-to-invest-rs-50000-crore-to-add-10gw-solar-energy-capacity-by-2022-2\/","title":{"rendered":"NTPC to invest Rs 50,000 crore to add 10GW solar energy capacity by 2022"},"content":{"rendered":"<p>NEW DELHI: State-owned power giant NTPCNSE -0.91 % is planning to add 10GW of solar energy generation capacity by 2022, which entails an investment of around Rs 50,000 crore, to be funded mainly by green bonds, a source has said.<\/p>\n<p>At present, NTPC has installed renewable energy capacity of 920 MW, which includes mainly solar energy. It has formulated a long term plan to become a 130 GW company by 2032 with 30 per cent non-fossil fuel or renewable energy capacity.<\/p>\n<p>&#8220;The company will complete tendering of 2,300 MW of solar energy capacity by the end of this fiscal. Thereafter it has planned to add 4GW each in 2020-21 and 2021-22.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: State-owned power giant NTPCNSE -0.91 % is planning to add 10GW of solar energy generation capacity by 2022, which entails an investment of around Rs 50,000 crore, to be funded mainly by green bonds, a source has said. At present, NTPC has installed renewable energy capacity of 920 MW, which includes mainly solar energy. It has formulated a long term plan to become a 130 GW company by 2032 with 30 per cent non-fossil fuel or renewable energy capacity. &#8220;The company will complete tendering of 2,300 MW of solar energy capacity by the end of this fiscal. Thereafter [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-307353","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/307353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=307353"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/307353\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=307353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=307353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=307353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}