{"id":300116,"date":"2019-11-08T11:27:47","date_gmt":"2019-11-08T05:57:47","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=300116"},"modified":"2019-11-08T11:52:13","modified_gmt":"2019-11-08T06:22:13","slug":"solar-project-developers-free-to-build-additional-capacity-if-supply-commitments-are-met-mnre","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/solar-project-developers-free-to-build-additional-capacity-if-supply-commitments-are-met-mnre\/","title":{"rendered":"Solar project developers free to build additional capacity if supply commitments are met: MNRE"},"content":{"rendered":"<p>Solar project developers will be free to take a call on setting up of additional power generation facilities if the energy supply commitments are met. A clarification to this effect was issued by the Ministry of New and Renewable Energy on Wednesday.<\/p>\n<p>This decision is expected to give relief to solar power project developers, an MNRE statement said.<\/p>\n<p>\u201cAs long as the solar PV power plant is in accordance with the contracted AC (alternating current) capacity and meets the range of energy supply based on capacity utilisation factor requirements, the design and installation of solar capacity on the DC (direct current) side should be left to the generator or developer,\u201d the MNRE statement said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar project developers will be free to take a call on setting up of additional power generation facilities if the energy supply commitments are met. A clarification to this effect was issued by the Ministry of New and Renewable Energy on Wednesday. This decision is expected to give relief to solar power project developers, an MNRE statement said. \u201cAs long as the solar PV power plant is in accordance with the contracted AC (alternating current) capacity and meets the range of energy supply based on capacity utilisation factor requirements, the design and installation of solar capacity on the DC (direct [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-300116","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/300116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=300116"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/300116\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=300116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=300116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=300116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}