{"id":296164,"date":"2019-10-15T11:46:46","date_gmt":"2019-10-15T06:16:46","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=296164"},"modified":"2019-10-15T11:46:46","modified_gmt":"2019-10-15T06:16:46","slug":"emirates-president-tim-clark-says-he-does-not-expect-to-take-any-boeing-777x-in-2020","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/emirates-president-tim-clark-says-he-does-not-expect-to-take-any-boeing-777x-in-2020\/","title":{"rendered":"Emirates president Tim Clark says he does not expect to take any Boeing 777x in 2020"},"content":{"rendered":"<p>Emirates doubts it will receive any of the 115 Boeing 777-9s it has ordered next year, its president said on Monday, as the US planemaker grapples with challenges in building the jet. Emirates, a launch customer of the world\u2019s biggest twin engined jet, was to receive its first 777-9 in 2020 but the manufacturer has suspended load testing of the plane. \u201c\u2026 By the end of next year we were to have eight of them. Now it doesn\u2019t look like we will have any,\u201d Tim Clark said at a conference in Dubai.<\/p>\n<p>Boeing suspended load testing of the new widebody in September when media reports said a cargo door failed a ground stress test. There have also been issues with General Electric Co\u2019s new GE9X turbine engine that will power the jet. Boeing has said it expects to hold the initial flight test in 2020 and is aiming for the 777X to enter commercial service in the same year. Clark said he had told Boeing he insists on a 13 to 16 month test period for the new jet.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Emirates doubts it will receive any of the 115 Boeing 777-9s it has ordered next year, its president said on Monday, as the US planemaker grapples with challenges in building the jet. Emirates, a launch customer of the world\u2019s biggest twin engined jet, was to receive its first 777-9 in 2020 but the manufacturer has suspended load testing of the plane. \u201c\u2026 By the end of next year we were to have eight of them. Now it doesn\u2019t look like we will have any,\u201d Tim Clark said at a conference in Dubai. Boeing suspended load testing of the new widebody [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[196,130,138],"tags":[],"class_list":["post-296164","post","type-post","status-publish","format-standard","hentry","category-civil-aviation-the-financial-express","category-newspapers","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/296164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=296164"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/296164\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=296164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=296164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=296164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}