{"id":292253,"date":"2019-09-18T04:51:48","date_gmt":"2019-09-18T04:51:48","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=292253"},"modified":"2019-09-18T04:51:48","modified_gmt":"2019-09-18T04:51:48","slug":"aptransco-to-withdraw-connectivity-nod-for-98mw-wind-projects","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/aptransco-to-withdraw-connectivity-nod-for-98mw-wind-projects\/","title":{"rendered":"APTRANSCO to withdraw connectivity nod for 98MW wind projects"},"content":{"rendered":"<p>BENGALURU: In another twist to the face-off between the Andhra Pradesh government and renewable energy developers, the state-owned transmission company, APTRANSCO, has decided to withdraw connectivity approval to wind projects for 98MW in the state.<\/p>\n<p>A note from APTRANSCO chairman to its chief engineer said excess capacity connectivity approvals had been given to 98MW of wind generators at Uravakonda substation. &#8220;After careful examination of the vigilance report, it is decided to remove the irregular connections and loads,&#8221; the memo, dated September 14, said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU: In another twist to the face-off between the Andhra Pradesh government and renewable energy developers, the state-owned transmission company, APTRANSCO, has decided to withdraw connectivity approval to wind projects for 98MW in the state. A note from APTRANSCO chairman to its chief engineer said excess capacity connectivity approvals had been given to 98MW of wind generators at Uravakonda substation. &#8220;After careful examination of the vigilance report, it is decided to remove the irregular connections and loads,&#8221; the memo, dated September 14, said.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-292253","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/292253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=292253"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/292253\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=292253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=292253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=292253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}