{"id":288826,"date":"2019-08-27T05:00:31","date_gmt":"2019-08-27T05:00:31","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=288826"},"modified":"2019-08-27T05:01:55","modified_gmt":"2019-08-27T05:01:55","slug":"lt-bags-significant-order-from-ntpc-to-set-up-fgd-system-at-mp-plant","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-bags-significant-order-from-ntpc-to-set-up-fgd-system-at-mp-plant\/","title":{"rendered":"L&amp;T bags &#8216;significant&#8217; order from NTPC to set up FGD system at MP plant"},"content":{"rendered":"<p>Infrastructure major Larsen &amp; Toubro (L&amp;T) on Monday said its power business has bagged a &#8220;significant&#8221; order from NTPC to set up flue gas desulphurisation system at Vindhyachal Super Thermal Power Station in Madhya Pradesh. <\/p>\n<p>L&amp;T has received engineering, procurement and construction (EPC) order to set up flue-gas desulphurisation (FGD) system at Vindhyachal Super Thermal Power Station at stage-I &amp; II (6&#215;210 mega watt (MW) &amp; 2&#215;500 MW, the company said in a BSE filing. <\/p>\n<p>This is in continuation to the order received for Stage III 0 IV (2&#215;500 MW 0 2&#215;500 MW) in September last year, it added. <\/p>\n<p>The company did not provide value of the contracts but said the orders fall under &#8220;significant&#8221; category which ranges between Rs 1,000 crore and Rs 2,500 crore as per its classification of contracts.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Infrastructure major Larsen &amp; Toubro (L&amp;T) on Monday said its power business has bagged a &#8220;significant&#8221; order from NTPC to set up flue gas desulphurisation system at Vindhyachal Super Thermal Power Station in Madhya Pradesh. L&amp;T has received engineering, procurement and construction (EPC) order to set up flue-gas desulphurisation (FGD) system at Vindhyachal Super Thermal Power Station at stage-I &amp; II (6&#215;210 mega watt (MW) &amp; 2&#215;500 MW, the company said in a BSE filing. This is in continuation to the order received for Stage III 0 IV (2&#215;500 MW 0 2&#215;500 MW) in September last year, it added. The [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-288826","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/288826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=288826"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/288826\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=288826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=288826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=288826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}