{"id":288735,"date":"2019-08-26T07:02:36","date_gmt":"2019-08-26T07:02:36","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=288735"},"modified":"2019-08-26T07:02:36","modified_gmt":"2019-08-26T07:02:36","slug":"larsen-toubro-bags-significant-order-from-ntpc-to-set-up-fgd-system-at-madhya-pradesh-plant","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/larsen-toubro-bags-significant-order-from-ntpc-to-set-up-fgd-system-at-madhya-pradesh-plant\/","title":{"rendered":"Larsen &amp; Toubro bags &#8216;significant&#8217; order from NTPC to set up FGD system at Madhya Pradesh plant"},"content":{"rendered":"<p>NEW DELHI: Infrastructure major Larsen &amp; Toubro (L&amp;T) on Monday said its power business has bagged a &#8220;significant&#8221; order from NTPC to set up flue gas desulphurisation system at Vindhyachal Super Thermal Power Station in Madhya Pradesh. <\/p>\n<p>L&amp;T has received engineering, procurement and construction (EPC) order to set up flue-gas desulphurisation (FGD) system at Vindhyachal Super Thermal Power Station at stage-I &amp; II (6&#215;210 mega watt (MW) &amp; 2&#215;500 MW, the company said in a BSE filing. <\/p>\n<p>This is in continuation to the order received for Stage III 0 IV (2&#215;500 MW 0 2&#215;500 MW) in September last year, it added. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: Infrastructure major Larsen &amp; Toubro (L&amp;T) on Monday said its power business has bagged a &#8220;significant&#8221; order from NTPC to set up flue gas desulphurisation system at Vindhyachal Super Thermal Power Station in Madhya Pradesh. L&amp;T has received engineering, procurement and construction (EPC) order to set up flue-gas desulphurisation (FGD) system at Vindhyachal Super Thermal Power Station at stage-I &amp; II (6&#215;210 mega watt (MW) &amp; 2&#215;500 MW, the company said in a BSE filing. This is in continuation to the order received for Stage III 0 IV (2&#215;500 MW 0 2&#215;500 MW) in September last year, it [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-288735","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/288735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=288735"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/288735\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=288735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=288735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=288735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}