{"id":28588,"date":"2015-08-13T11:44:24","date_gmt":"2015-08-13T11:44:24","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=28588"},"modified":"2015-08-13T11:44:24","modified_gmt":"2015-08-13T11:44:24","slug":"gmr-infrastructures-vemagiri-power-plant-commences-operations","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/gmr-infrastructures-vemagiri-power-plant-commences-operations\/","title":{"rendered":"GMR Infrastructure&#8217;s Vemagiri power plant commences operations"},"content":{"rendered":"<p>GMR Infrastructure today said its GVPGL power plant at Vemagiri in Andhra Pradesh has started operations under government&#8217;s scheme for utilisation of gas based power plants. <\/p>\n<p>&#8220;GMR Vemagiri Power Generation Limited (GVPGL) at Vemagiri successfully commenced its operation from August 12, 2015 under &#8216;Scheme for Utilisation of Stranded Gas based power plants&#8217; as launched by Government of India (GoI) in the month of March, 2015,&#8221; the firm said in a BSE filing. <\/p>\n<p>With a capacity of 370 MW, the plant is operating at 95 per cent plant load factor (PLF) at present, thereby generating 350 MW and supplying power to AP Transco. <\/p>\n<p>&#8220;Current operations will continue up to September 30, thereafter GoI will call for a fresh round of bidding. The scheme envisages government subsidies from the Power System Development Fund (PSDF) through a transparent ebid process,&#8221; it said. <\/p>\n<p>Shares of GMR Infrastructure were trading at Rs 12.80 apiece, down by 3.83 per cent, on the BSE.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GMR Infrastructure today said its GVPGL power plant at Vemagiri in Andhra Pradesh has started operations under government&#8217;s scheme for utilisation of gas based power plants. &#8220;GMR Vemagiri Power Generation Limited (GVPGL) at Vemagiri successfully commenced its operation from August 12, 2015 under &#8216;Scheme for Utilisation of Stranded Gas based power plants&#8217; as launched by Government of India (GoI) in the month of March, 2015,&#8221; the firm said in a BSE filing. With a capacity of 370 MW, the plant is operating at 95 per cent plant load factor (PLF) at present, thereby generating 350 MW and supplying power to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-28588","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/28588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=28588"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/28588\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=28588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=28588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=28588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}