{"id":280161,"date":"2019-07-04T06:08:48","date_gmt":"2019-07-04T06:08:48","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=280161"},"modified":"2019-07-04T06:08:48","modified_gmt":"2019-07-04T06:08:48","slug":"mp-road-dept-completes-3-roads-work-costing-rs-753-cr","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/mp-road-dept-completes-3-roads-work-costing-rs-753-cr\/","title":{"rendered":"MP road dept completes 3 roads work costing Rs 753 cr"},"content":{"rendered":"<p>Madhya Pradesh Road Development Corporation has completed the work of 3 roads costing Rs 753 crores under BOT scheme in the last 6 months. Special attention has been taken to ensure quality of these works.<\/p>\n<p>A sum of Rs 410 crore has been spent on the construction of Mangawa-Chakghat National Highway No. 27 length 52.07 km 4-lane road. Similarly, Rs 176 crores have been spent on the construction of 74.40 km long 2-lane road on Rau-Mau-Mandaleshwar State Highway No. 1 and Rs 167 crores have been spent on the construction of the 19 km long 2\/4 lane road on Ghoga-Bilua main District Road.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Madhya Pradesh Road Development Corporation has completed the work of 3 roads costing Rs 753 crores under BOT scheme in the last 6 months. Special attention has been taken to ensure quality of these works. A sum of Rs 410 crore has been spent on the construction of Mangawa-Chakghat National Highway No. 27 length 52.07 km 4-lane road. Similarly, Rs 176 crores have been spent on the construction of 74.40 km long 2-lane road on Rau-Mau-Mandaleshwar State Highway No. 1 and Rs 167 crores have been spent on the construction of the 19 km long 2\/4 lane road on Ghoga-Bilua [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,213,144],"tags":[],"class_list":["post-280161","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/280161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=280161"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/280161\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=280161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=280161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=280161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}