{"id":27665,"date":"2015-08-06T11:55:00","date_gmt":"2015-08-06T11:55:00","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=27665"},"modified":"2015-08-06T11:55:00","modified_gmt":"2015-08-06T11:55:00","slug":"cil-ramps-up-coal-evacuation-to-procure-wagons-worth-rs-555-crore","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/cil-ramps-up-coal-evacuation-to-procure-wagons-worth-rs-555-crore\/","title":{"rendered":"CIL ramps up coal evacuation, to procure wagons worth Rs 555 crore"},"content":{"rendered":"<p>In a bid to ramp up coal evacuation capacity, state-owned CIL is planning to procure wagons with an estimated investment of Rs 555 in the first phase. <\/p>\n<p>&#8220;In order to facilitate coal evacuation and add to its evacuation capacity, keeping in view of the envisaged quantum jump in production, Coal India has planned to procure high-capacity wagons with an estimated investment of Rs 555 crore in the first phase,&#8221; Minister of State for Coal and Power Piyush Goyal said in a written reply to Lok Sabha. <\/p>\n<p>The minister further said that the fleet of wagons are for operation of railways and dedicated only for transport of coal from the specified coal subsidiaries and on specific routes. <\/p>\n<p>Coal production, he further said, has not suffered due to transportation constraints in moving the dry fuel from pit head to sidings and delay in construction of rail infrastructure. <\/p>\n<p>The railway infrastructure projects which have been taken up for coal evacuation includes Tori- Shivpur New BG Line&#8211;94 km (approximately) length&#8211;in Jharkhand and Jharsuguda-Barpali-Sardega Rail Link&#8211;53 km (approximately) length in Odisha, he said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a bid to ramp up coal evacuation capacity, state-owned CIL is planning to procure wagons with an estimated investment of Rs 555 in the first phase. &#8220;In order to facilitate coal evacuation and add to its evacuation capacity, keeping in view of the envisaged quantum jump in production, Coal India has planned to procure high-capacity wagons with an estimated investment of Rs 555 crore in the first phase,&#8221; Minister of State for Coal and Power Piyush Goyal said in a written reply to Lok Sabha. The minister further said that the fleet of wagons are for operation of railways [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[131],"tags":[],"class_list":["post-27665","post","type-post","status-publish","format-standard","hentry","category-coal"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/27665","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=27665"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/27665\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=27665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=27665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=27665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}