{"id":276539,"date":"2019-05-29T06:44:29","date_gmt":"2019-05-29T06:44:29","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=276539"},"modified":"2019-05-29T06:57:44","modified_gmt":"2019-05-29T06:57:44","slug":"work-begins-for-cable-stayed-bridge-at-govindpur","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/work-begins-for-cable-stayed-bridge-at-govindpur\/","title":{"rendered":"Work begins for cable-stayed bridge at Govindpur"},"content":{"rendered":"<p>The ambitious project of state road construction department (RCD) cable-stayed bridge at the Govindpur locality of the city has started progressing with commencement of work. The cable-stayed bridge is being set up keeping in view rising rush of movement of heavy vehicles from the industrial hub of Govindpur.<\/p>\n<p>The bridge is being set up at a cost of Rs 138 crores by state road construction department (RCD). The bridge will be in association with SP Singla Construction Pvt Ltd. The spade-work for this ambitious project has begun in the form of sub-soil exploration work by another private agency.<\/p>\n<p>This four-lane elevated corridor with cable-stayed bridge with approach road starting from Anna Chowk of Govindpur will connect to NH-33 at Pipla.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The ambitious project of state road construction department (RCD) cable-stayed bridge at the Govindpur locality of the city has started progressing with commencement of work. The cable-stayed bridge is being set up keeping in view rising rush of movement of heavy vehicles from the industrial hub of Govindpur. The bridge is being set up at a cost of Rs 138 crores by state road construction department (RCD). The bridge will be in association with SP Singla Construction Pvt Ltd. The spade-work for this ambitious project has begun in the form of sub-soil exploration work by another private agency. This four-lane [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,213,144],"tags":[],"class_list":["post-276539","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/276539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=276539"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/276539\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=276539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=276539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=276539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}