{"id":270408,"date":"2019-04-22T10:15:31","date_gmt":"2019-04-22T10:15:31","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=270408"},"modified":"2020-05-05T19:17:48","modified_gmt":"2020-05-05T13:47:48","slug":"cod-of-ntpcs-barh-unit-4","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/cod-of-ntpcs-barh-unit-4\/","title":{"rendered":"CoD of NTPC\u2019s Barh unit-4"},"content":{"rendered":"<p>The spat between NTPC Ltd and Gridco, Odisha&#8217;s bulk power purchaser cum trader over contentious power billing, shows no sign of subsiding.<\/p>\n<p>NTPC&#8217;s alleged illegal declaration of Commercial Operations Date (COD) and unauthorized billing worth Rs 360 cr of infirm power as scheduled power from the Stage-II (1320 MW) of its Barh super thermal power station. Gridco had challenged NTPC&#8217;s contention in CERC and got a favourable order in Sep 2017. Later, NTPC moved the Appellate Tribunal for Electricity (APTEL). APTEL in its order pronounced in Jan 2019, upheld CERC&#8217;s order, dealing a body blow to NTPC&#8217;s pleas.<\/p>\n<p><a href=\"https:\/\/livemedia.press\/product-category\/subscribe-il\/?v=56b5fbba0fe8\" target=\"_blank\" rel=\"noopener noreferrer\"><img decoding=\"async\" class=\" alignright\" src=\"http:\/\/telecomlive.in\/web\/wp-content\/uploads\/2015\/05\/read-more.gif\" alt=\"http:\/\/telecomlive.in\/web\/wp-content\/uploads\/2015\/05\/read-more.gif\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The spat between NTPC Ltd and Gridco, Odisha&#8217;s bulk power purchaser cum trader over contentious power billing, shows no sign of subsiding. NTPC&#8217;s alleged illegal declaration of Commercial Operations Date (COD) and unauthorized billing worth Rs 360 cr of infirm power as scheduled power from the Stage-II (1320 MW) of its Barh super thermal power station. Gridco had challenged NTPC&#8217;s contention in CERC and got a favourable order in Sep 2017. Later, NTPC moved the Appellate Tribunal for Electricity (APTEL). APTEL in its order pronounced in Jan 2019, upheld CERC&#8217;s order, dealing a body blow to NTPC&#8217;s pleas. &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":270409,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[119],"tags":[],"class_list":["post-270408","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-magazinenews"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/270408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=270408"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/270408\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media\/270409"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=270408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=270408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=270408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}