{"id":266706,"date":"2019-03-27T07:22:30","date_gmt":"2019-03-27T07:22:30","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=266706"},"modified":"2019-03-27T07:28:07","modified_gmt":"2019-03-27T07:28:07","slug":"lt-bags-rs-352-cr-solar-plant-order-from-raasi-green-earth","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-bags-rs-352-cr-solar-plant-order-from-raasi-green-earth\/","title":{"rendered":"L&amp;T bags Rs. 352-cr solar plant order from Raasi Green Earth"},"content":{"rendered":"<p>Engineering and construction major, L&amp;T, has bagged a Rs. 352-crore contract for building a 100 MW solar plant for the Bengaluru-based Raasi Green Earth Energy Pvt Ltd. The plant is coming up in Ramanathapuram district of Tamil Nadu.<\/p>\n<p>The plant will be commissioned by September, C Narasimhan, CMD of Raasi Green told BusinessLine .<\/p>\n<p>Raasi will supply the power generated by the plant to the State\u2019s electricity distribution utility, Tangedco, at a tariff of Rs. 3.47 a kWhr, for 25 years, Narasimhan said.<\/p>\n<p>The plant will be connected to the Kavanur substation near Paramakudi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineering and construction major, L&amp;T, has bagged a Rs. 352-crore contract for building a 100 MW solar plant for the Bengaluru-based Raasi Green Earth Energy Pvt Ltd. The plant is coming up in Ramanathapuram district of Tamil Nadu. The plant will be commissioned by September, C Narasimhan, CMD of Raasi Green told BusinessLine . Raasi will supply the power generated by the plant to the State\u2019s electricity distribution utility, Tangedco, at a tariff of Rs. 3.47 a kWhr, for 25 years, Narasimhan said. The plant will be connected to the Kavanur substation near Paramakudi.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-266706","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/266706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=266706"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/266706\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=266706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=266706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=266706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}